Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20141N830 + (ML20141N830)
- ML20141N831 + (ML20141N831)
- ML20141N832 + (ML20141N832)
- ML20141N833 + (ML20141N833)
- ML20141N834 + (ML20141N834)
- ML20141N836 + (ML20141N836)
- ML20141N838 + (ML20141N838)
- PNO-V-86-010, on 860312,reactor Brought Critical Following Negative Rate Trip During Net Load Startup Test on 860311. Reactor Declared in Commercial Operation on 860313 + (ML20141N839)
- ML20141N840 + (ML20141N840)
- ML20141N841 + (ML20141N841)
- ML20141N842 + (ML20141N842)
- ML20141N844 + (ML20141N844)
- ML20141N845 + (ML20141N845)
- ML20141N846 + (ML20141N846)
- ML20141N847 + (ML20141N847)
- ML20141N849 + (ML20141N849)
- ML20141N850 + (ML20141N850)
- ML20141N851 + (ML20141N851)
- ML20141N852 + (ML20141N852)
- ML20141N853 + (ML20141N853)
- ML20141N856 + (ML20141N856)
- ML20141N857 + (ML20141N857)
- ML20141N858 + (ML20141N858)
- ML20141N860 + (ML20141N860)
- IR 05000269/1986003 + (ML20141N861)
- ML20141N862 + (ML20141N862)
- IR 05000338/1985024 + (ML20141N863)
- HBL-86-005, Forwards Rev 1 to Tech Specs for Decommissioning of Humboldt Bay Power Plant Unit 3. Rev Incorporates Util Commitments in Response to Questions During NRC Review of Decommissioning Plan + (ML20141N864)
- ML20141N865 + (ML20141N865)
- ML20141N866 + (ML20141N866)
- ML20141N867 + (ML20141N867)
- ML20141N869 + (ML20141N869)
- ML20141N870 + (ML20141N870)
- ML20141N871 + (ML20141N871)
- ML20141N873 + (ML20141N873)
- ML20141N875 + (ML20141N875)
- ML20141N876 + (ML20141N876)
- ML20141N879 + (ML20141N879)
- ML20141N880 + (ML20141N880)
- ML20141N881 + (ML20141N881)
- PNO-III-86-019, on 860307,licensee Began Unscheduled 16-day Shutdown to Replace Degraded Seals in Two Primary Coolant Pumps.Repair of Leaking Loop Isolation Check Valve & Pressure Control Valves Also Planned + (ML20141N882)
- AECM-86-0019, Forwards Metallurgical Evaluation of Recirculation Piping Ctr Cross Surface Cracking Following Induction Heat Stress Improvement,Grand Gulf Nuclear Station - Unit 1, Final Rept + (ML20141N884)
- ML20141N885 + (ML20141N885)
- ML20141N886 + (ML20141N886)
- ML20141N887 + (ML20141N887)
- ML20141N888 + (ML20141N888)
- ML20141N889 + (ML20141N889)
- U-600462, Final Deficiency Rept 55-85-15 Re Classification of Instrument Lines Connected to Rcpb.Initially Reported on 851227.Review Determined That Deficiency Not Reportable Per 10CFR50.55(e) + (ML20141N890)
- ML20141N891 + (ML20141N891)
- ML20141N892 + (ML20141N892)
- ML20141N893 + (ML20141N893)