ML20141N870
| ML20141N870 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 03/14/1986 |
| From: | Styles L ISHAM, LINCOLN & BEALE |
| To: | Treby S NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
| Shared Package | |
| ML20141N871 | List: |
| References | |
| CON-#186-414 OL, NUDOCS 8603180227 | |
| Download: ML20141N870 (1) | |
Text
~
,.g.
kenr numn gg4g/457et 9 ROD t f!TIL. FAQ'N E D8 E ISHAM,UNCOL 00CMETED RELATED CORRESPO COUNSRORS AT LAW USHRC 1150 CONNECTICUT AVENUE.N W e SUITE 1100
=;=;;;':'.:.:n'
- 86 MAR 17 m) :25,,,,,g, p,pm,,7,j,
- ";lT E L'
- gg,
-..E.u..
" " * ~ " "
March 14, 1986 0FFICE OF EleIAr #
00CMETING A SEMI BRANC61 Stuart Treby, Esquire Office of the Executive Legal Director U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Treby:
I am enclosing a Notice of Deposition of NRC Staff member Robert F. Heishman, Chief of Reactor Construction Programs Branch, Office of Inspection and Enforcement.
During his deposition on March 11, 1986, P. Keshishian identified Mr. Heishman, who approved the CAT inspection report, as having responsibility for the two major areas of concern raised by the CAT inspection group.
These areas are reliance on final walkdowns and management of on-going corrective action programs while ensuring correct performance of current work.
Mr. Heishman's deposition has been scheduled for Monday, March 24, 1986 in Bethesda, prior to the previously noticed depositions of CAT Team members Georgiev and Hooks.
Given the limited scope of the Heishman deposition, Joe Gallo feels that he can complete all three depositions on the 24th.
Bob Guild has agreed to this schedule.
Please call me or Joe if this poses a problem.
Very truly yours, Lisa C. Styles LCS/ kit cc:
Service List Enclosure 8603180227 860314 PDR ADOCK 05000456 G
._