ML20141N849

From kanterella
Jump to navigation Jump to search

Advises That Mods to Alternate Shutdown Sys,Radiant Energy Shields & Associated Circuit Requirements Completed Per App R to 10CFR50 Requirements.Mods Described in 860228 Integrated Plan Semiannual Update 4,Issues A-075A,B & C
ML20141N849
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 03/12/1986
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Berry K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
TAC-55067, TAC-55075, TAC-59800, NUDOCS 8603180202
Download: ML20141N849 (3)


Text

m I Docket No. 50-155 Mr. Kenneth W. Berry Director, Nuclear Licensing Consumers Power Company l

1945 West Parnall Road Jackson, Michigan 49201

Dear Mr. Berry:

i

SUBJECT:

APPENDIX R FIRE PROTECTION MODIFICATIONS LICENSING ACTIVITY (TAC 55067, 55075) i Re: Big Rock Point Plant j During the Big Rock Point Plant (the facility) 1985 refueling outage, several facility modifications required by Appendix R to 10 CFR Part 50 were completed. Specifically, the Alternate Shutdown System, Radiant Energy Shields, and Associated Circuit requirements have been reported as completed as described in Issue A-075A, B, and C respectively, of the Integrated Plan Semi-Annual Update No. 4 dated February 28, 1986, j Specific configurations for the above mentioned facility modifications, i including new structures, instrumentation and cabling, shielding, and l associated plant procedures will be inspected and reviewed for compliance to the requirements of Appendix R to 10 CFR Part 50. The inspection will be conducted by NRC staff in Region III. Any findings or open items resulting ,

from these inspections, will be carried as issues requiring further action ,

as documented in the Region III Inspection Report. Except for the facility Alternate Shutdown System Technical Specifications, (TAC 59800), licensing activity for TAC 55067 and 55075 is considered complete.

Sincerely, WW W John A. Zwolinski, Director RWR Pro.iect Directorate #1 Division of BWR Licensing cc: Sec next page DISTRIBUTION RGrimes GHolahan

"" CGrimes JPartlow Local PDR TRote11a JStang RWD#1 Reading CJamerson RRernero JZwolinski 55 060318A IE"o DR OELD ACRS (10) PDR EJordan F ,

DBL:PD#1h DAL:PD#1 M DRL:PD#1 <

CJamerson TRote11a:tm JZwolinski 3 / 6 /86 3/n/86 3 /gt,/86

, P Rt jog UNITED STATES 8(* a NUCLEAR REGULATORY COMMISSION i WASHINGTON, D C. 20555

%,,,,,# March 12,1986 Docket No. 50-155 Mr. Kenneth W. Berry Director, Nuclear Licensina (

Consumers Power Company '

1945 West Parnall Road  !

Jackson, Michigan 49201 l

Dear Mr. Berry:

a

SUBJECT:

APPENDIX R FIRE PROTECTION MODIFICATIONS LICENSING ACTIVITY (TAC 55067, 55075) 4 Re: Rio Rock Point Plant Ouring the Big Rock Point Plant (the facility) 1985 refuelinn outage, several facility modifications required by Appendix R to 10 CFR Part 50 were completed. Specifically, the Alternate Shutdown System, padiant j Eneray Shields, and Associated Circuit requirenents have been reported as completed as described in Issue A-075A, 8, and C resoectively, of the Integrated Plan Semi-Annual tipdate No. 4 dated February ?8, 1986.

Specific configurations for the above mentioned facility modifications, f including new structures, instrurrentation and cabling, shieldinq, and associated plant procedures will be inspected and reviewed for compliance j

' to the requirements of Appendix i. to 10 CFR Part 50. The inspection will be i

conducted by NRC staff in Region III. Anv findings or open items resultinq from these inspections, will be carried as issues requiring further actior

' as documented in the Region III Inspection Report. Except for the facility j

Alternate Shutdown System Technical Soecifications, (TAC 598001, licensinq .

activity for TAC 55067 and 55075 is considered comolete. '

Sincerely,

]

,i I

S \. 7wolinski, Director ilohn t

RWR P o.iect Directorate #1 Division of BWR Licensing cc: See next page t

~

! ..' Mr. Kenneth W. Berry Consumers Power Company 810 Rock Point Plant cc:

' Mr. Thomas A. McNish, Secretary Consumers Power Company 212 West Michigan Avenue. >

Jackson, Michigan 49201

l. Judd L. Racon, Escuire i Consumers Power Company

! 212' West Michigan Avenue

l. Jackson. Michigan 49201 l Rio Rock Point Plant i ATTN: Mr. David P. Hof fman i

. Plant Superintendent Route 3 Post Office Rox 591 Charlevoix, Michigan 49720 i

i Mr. I. Lee Moerland Chairman, Board of Commissioners l

P. O. Box 218 Charlevoix, Michigan 49720 Office of the Governor Room 1 - Capitol Building Lansing, Michiqan 48913 I Regiona1' Administrator i Nuclear Reculatory Commission, Region I!!

799 Roosevelt Road Glen Ellyn, Illir.ois 60137 l

Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health P. O. Box 30035 Lansing, Michigan 48909 Resident inspector Rio Rock Point Plant c/o U.S. NRC

, RR #3, Rox 600 l Charlevoix, Michigan 49720 1

i i

f r

_ _ _ _ _ _ - - _ _ . _ - _ _ - - _ - _ _ _ - _ _ - _ _ _ _ - - - - _ _ - _ - - - - _ - - - - - - - _ -______