Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000454/LER-1985-096, :on 851207,incorrect Containment Pressure Loops Utilized to Fulfill post-accident Monitoring Requirements, Per Tech Spec 3/4.3.3.6.Caused by Personnel Error.Complete Calibr on Loops Performed.Procedure Revised + (ML20141H165)
- ML20141H166 + (ML20141H166)
- ML20141H168 + (ML20141H168)
- ML20141H169 + (ML20141H169)
- ML20141H170 + (ML20141H170)
- IR 05000361/1997010 + (ML20141H171)
- ML20141H172 + (ML20141H172)
- B16555, Advises NRC of Six Discrepancies in Unit 3 SER (NUREG-1031) Identified During Our Configuration Mgt Program Review. Commitments,Encl + (ML20141H173)
- U-600391, Final Potential Deficiency Rept 55-85-13 Re Use of Unqualified Model HX4 Daniel Crimping Tools for Class 1E/safety-related Applications.Initially Reported on 851120. Issue Not Reportable Per 10CFR50.55(e) + (ML20141H174)
- ML20141H176 + (ML20141H176)
- ML20141H178 + (ML20141H178)
- HL-5432, Informs of Discrepancy in 950303 NRC SER for Plant Improved TS Re Relocation of Info.Approval for Removing PCP General Description from QA Program Section of Fsar,Requested + (ML20141H179)
- ML20141H180 + (ML20141H180)
- ML20141H181 + (ML20141H181)
- ML20141H182 + (ML20141H182)
- ML20141H184 + (ML20141H184)
- ST-HL-AE-5648, Forwards 2RE05 ISI Summary Rept for SG Tubing of STP Electric Generating Station - Unit 2 + (ML20141H185)
- ML20141H187 + (ML20141H187)
- ML20141H188 + (ML20141H188)
- ML20141H189 + (ML20141H189)
- IR 05000483/1997008 + (ML20141H191)
- ML20141H192 + (ML20141H192)
- ML20141H193 + (ML20141H193)
- B16577, Monthly Operating Rept for June 1997 for Mnps,Unit 3 + (ML20141H194)
- ML20141H196 + (ML20141H196)
- ML20141H198 + (ML20141H198)
- ML20141H199 + (ML20141H199)
- PY-CEI-NRR-2189, Monthly Operating Rept for June 1997 for Perry Nuclear Power Plant,Unit 1 + (ML20141H200)
- B12049, Submits Addl Info Supporting 860307 Fire Protection Schedular Exemption Request W/Respect to Criteria Specified in SECY-85-306,per 860401 Meeting.Info Addresses Status of Engineering Analysis & Design Work Re Switchgear Room + (ML20141H201)
- ML20141H203 + (ML20141H203)
- B12050, Application for Amend to License DPR-61,adding Item (I) to Tech Spec Section 4.10.1,D-1 Providing Addl Acceptance Criteria for Tube Insps.Fee Paid.W/O Fee + (ML20141H204)
- ML20141H205 + (ML20141H205)
- ML20141H206 + (ML20141H206)
- ML20141H207 + (ML20141H207)
- ML20141H208 + (ML20141H208)
- ML20141H210 + (ML20141H210)
- ML20141H214 + (ML20141H214)
- ST-HL-AE-1654, Advises That Factors X/Q Will Not Be Recalculated Based on Study in Which Relative Effects of Local Terrain on Atmospheric Dispersion Factors Determined.Results Support Original Approach to X/Q Development + (ML20141H216)
- ML20141H218 + (ML20141H218)
- ML20141H219 + (ML20141H219)
- ML20141H221 + (ML20141H221)
- ML20141H222 + (ML20141H222)
- ML20141H224 + (ML20141H224)
- ML20141H227 + (ML20141H227)
- ML20141H229 + (ML20141H229)
- ML20141H232 + (ML20141H232)
- ML20141H235 + (ML20141H235)
- ML20141H237 + (ML20141H237)
- NG-97-1258, Monthly Operating Rept for June 1997 for DAEC Per GL 97-02 + (ML20141H238)
- ML20141H241 + (ML20141H241)
- NSD-NRC-97-5238, Forwards Suppl Responses for RAIs 231.35 & 231.36 Re Site Characterization Rais.Rai 231.36 Includes Markup of Portion of Chapter 2 of SSAR + (ML20141H242)