Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138Q948 + (ML20138Q948)
- ML20138Q949 + (ML20138Q949)
- ML20138Q951 + (ML20138Q951)
- ML20138Q952 + (ML20138Q952)
- ML20138Q953 + (ML20138Q953)
- ML20138Q955 + (ML20138Q955)
- PY-CEI-NRR-0424, Informs That Alternate Shutdown Cooling & Applicability of Secondary Containment Control Guide to Be Addressed Prior to post-refueling Startup.Info Submitted Per 851206 Request for Addl long-term Info Re Plant Emergency Operating Pro + (ML20138Q956)
- ML20138Q958 + (ML20138Q958)
- ML20138Q959 + (ML20138Q959)
- ML20138Q960 + (ML20138Q960)
- 1CAN128503, Application for Amend to License DPR-51,revising Tech Specs to Reflect Organizational Changes & to Make Spec 6.5.2.8 Consistent W/Sts.Fee Paid + (ML20138Q961)
- ML20138Q962 + (ML20138Q962)
- ML20138Q963 + (ML20138Q963)
- U-600348, Requests Exemption from NUREG-0737,Item II.F.1 Requirement Re in Situ Calibr of Drywell high-range Radiation Monitors. Justification for Variance Request & Proposed Alternative Calibr Method Encl + (ML20138Q965)
- ML20138Q966 + (ML20138Q966)
- ML20138Q969 + (ML20138Q969)
- ML20138Q970 + (ML20138Q970)
- PNO-V-85-089, on 851222,shutdown Occurred When RCS Leak Detected.Caused by Loose Valve Stem Packing on Pressurizer Sample Line Valve Sfv 70001.Loose Packing Readjusted. Repacking of Valve Planned.Power Will Be Resumed by 851224 + (ML20138Q972)
- ST-HL-AE-1499, Forwards Response to Draft SER or FSAR Items D 2.5-4, D 2.5-3,D 2.5-1,D 2.5-2,D 2.5.6 & Q231.19N-1 Re Summary Statement of Geologic Structures & Significance & reservoir- Induced Seismicity.Related Correspondence + (ML20138Q973)
- ML20138Q974 + (ML20138Q974)
- ML20138Q975 + (ML20138Q975)
- AECM-85-0392, Forwards Rev 6 to Emergency Plan Procedure 10-S-01-4, Site Area Emergency, Rev 7 to 10-S-01-5, General Emergency, Rev 8 to 10-S-01-12, Offsite Dose Calculations & Rev 7 to 10-S-01-14, Offsite Radiological Monitoring. W/O Encls + (ML20138Q976)
- ML20138Q977 + (ML20138Q977)
- U-600365, Forwards Clinton Power Station Inservice Insp Pump & Valve Testing Program, Per SER (NUREG-0853) Confirmatory Issue 68.Program Describes How Requirements of ASME Boiler & Pressure Vessel Code,Section XI Will Be Met + (ML20138Q978)
- ML20138Q979 + (ML20138Q979)
- ML20138Q981 + (ML20138Q981)
- ML20138Q982 + (ML20138Q982)
- ML20138Q983 + (ML20138Q983)
- ML20138Q984 + (ML20138Q984)
- ML20138Q987 + (ML20138Q987)
- ML20138Q990 + (ML20138Q990)
- ML20138Q994 + (ML20138Q994)
- ML20138Q995 + (ML20138Q995)
- ML20138Q996 + (ML20138Q996)
- PNO-III-85-095D, on 851113,bearing Damage Occurred to Diesel Generators 13,11 & 14.Caused by Insufficient break-in Period.Bearing Replacement Required for Diesel Generator 11. Decrease in Lubricating Oil Viscosity Noted for 12 & 14 + (ML20138Q998)
- ML20138Q999 + (ML20138Q999)
- ML20138R000 + (ML20138R000)
- ML20138R001 + (ML20138R001)
- ML20138R002 + (ML20138R002)
- ML20138R004 + (ML20138R004)
- ML20138R006 + (ML20138R006)
- ML20138R007 + (ML20138R007)
- ML20138R008 + (ML20138R008)
- ML20138R009 + (ML20138R009)
- ML20138R010 + (ML20138R010)
- 2CAN128507, Application for Amend to License NPF-6,changing Tech Specs to Clarify Responsibility of Safety Review Committee Appointments & Total Membership of Committee & to Make Section 6.5.2.8 Consistent W/Sts.Fee Paid + (ML20138R012)
- ML20138R013 + (ML20138R013)
- ML20138R014 + (ML20138R014)
- ML20138R015 + (ML20138R015)
- ML20138R016 + (ML20138R016)
- ML20138R017 + (ML20138R017)