ML20138Q970

From kanterella
Jump to navigation Jump to search
Provides Current Status of Prediction When Reactor Vessel Beltline Matls Will Have Charpy Upper Shelf Energy of 50 ft-lbs.Energy Should Be Reached by 1994 Instead of Initial Estimate of 1983 Contained in
ML20138Q970
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/20/1985
From: Leblond P
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
1031K, NUDOCS 8512300153
Download: ML20138Q970 (2)


Text

r. 9 , . }

N C:mm:nwmith Edison '

j(( h One First National Plaza. ChrCago. Ilhnog s/ Address Reply to. Post Office Box 767  !

Chicago. Ilknois 60690 6

December 20, 1985 Mr. Harold R. Denton, Director

. Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Subj ect: Zion Nuclear Power Station Units 1 and 2 Reactor Pressure Vessel Upper Shelf Energy - 10 CFR 50, Appendix G NRC Docket Nos. 50-295 and 50-304

Reference:

May 6, 1980 letter from D. L. Peoples to H. R. Denton.

Dear Mr. Denton:

Section V.E of 10 CFR 50, Appendix G requires that a licensee notify the Office of Nuclear Reactor Regulation at least three years prior to the date when the reactor vessel beltline materials are predicted to have a charpy upper-shelf energy of less than 50 ft-lbs. The referenced letter provided an estimate of this date based upon preliminary data. The letter also stated that the initial estimate of 1983 appeared to be conservative and that this date would be reviewed when additional surveillance capsule data became available. This letter provides the current status of this o issue and based upon a revised estimate of 1994, withdraws the notification made by the reference.

There have been a total of five surveillance capsules withdrawn from the " ion units. This has provided substantially more data than was

, available in May of 1980. Utilizing this data, it is estimated that an upper-shelf energy of 50 ft-lbs will be reached at a fluence of approximately 5 x 1018 neutrons /Cm2 ,

Low leakage loading patterns were implemented in Unit 1 Cycle 7 and Unit 2, Cycle 6. Unit 1. Cycle 9 is currently in operation and Unit 2,

Cycle 9 will start operation in January of 1986. These changes have resulted in reduced reactor vessel fluence projections, which has been
>- provided to the NRC Staff in WCAP 10902. The revised projections predict that the Zion reactor pressure vessels will reach a fluence of 5 x 1018
  • neutrons /Cm2 at the 1/4 T location after approximately 14 effective full power years (EFPY) of operation.

h 6h*-

AD - J. Knight (ltr only)

'8512300153 851220 EB (BALLARD)

PDR ADOCK 05000295  ! EICSB (ROSA)

P. PDR $Yk PSB (GAMMILL)

RSB (BERLINGER)

'D F0s (BENAROYA) l

__. -- _ - . _ _ _._ _. _ ,._ _ ._ _ - .~ _ _ _._ _ . . _

<~

H. R. Denton December 20, 1985 4

As of September, 1985 Unit I had 7.11 E?PY of operation and Unit 2 had 7.21 EFPY. Utilizing a conservative overall capacity factor of 0.8 EFPY per calendar year, the earliest date that the upper-shelf energy could fall below 50 ft-lbs would be in 1994.

Based upon the above discussion, Commonwealth Edison Company withdraws the notification made by the reference. This issue will continue to be evaluated as additional surveillance capsule data becomes available.

If that evaluation confirms the validity of the 1994 estimate, then the required notification per Appendix G will be made in accordance with the three-year lead time.

If any further questions arise concerning this matter, please contact this office.

Very truly yours, Peter C. LeBlond Nuclear Licensing Administrator im cc: Resident Inspector - Zion J. A. Norris - NRR 1031K

_ _ _