Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B11681, Forwards Summary of Integrated Safety Assessment Program Topic 1.17, Replacement of Motor-Operated Valves, Which Was Evaluated for Public Safety Impacts,Per 850731 Request. Safety Impact Scores Considered Preliminary + (ML20138L008)
- ML20138L009 + (ML20138L009)
- ML20138L011 + (ML20138L011)
- ML20138L013 + (ML20138L013)
- ML20138L014 + (ML20138L014)
- ML20138L018 + (ML20138L018)
- ML20138L019 + (ML20138L019)
- ML20138L020 + (ML20138L020)
- ML20138L022 + (ML20138L022)
- ML20138L024 + (ML20138L024)
- ML20138L026 + (ML20138L026)
- ML20138L027 + (ML20138L027)
- ML20138L031 + (ML20138L031)
- ML20138L034 + (ML20138L034)
- ML20138L035 + (ML20138L035)
- ML20138L037 + (ML20138L037)
- IR 05000373/1985036 + (ML20138L039)
- ML20138L040 + (ML20138L040)
- ML20138L044 + (ML20138L044)
- ML20138L045 + (ML20138L045)
- ML20138L049 + (ML20138L049)
- ML20138L050 + (ML20138L050)
- PNO-III-85-102, on 851214,during Outage,Both Trains of RHR Sys Lost When Water in Reactor Vessel Drained Below Level of Suction Line.Caused by Erroneous Control Room Indication of RCS Configuration Used for Outage + (ML20138L055)
- ML20138L056 + (ML20138L056)
- ML20138L057 + (ML20138L057)
- ML20138L058 + (ML20138L058)
- 05000352/LER-1985-077, :on 850926,spurious Div IV Trip Signals Received Resulting in Load Shedding in Anticipation of Diesel Generator Loading.Caused by Loose Connection in Power Panel.Connection Tightened + (ML20138L061)
- ML20138L062 + (ML20138L062)
- ML20138L064 + (ML20138L064)
- ML20138L065 + (ML20138L065)
- ML20138L066 + (ML20138L066)
- ML20138L069 + (ML20138L069)
- ML20138L070 + (ML20138L070)
- ML20138L072 + (ML20138L072)
- ML20138L074 + (ML20138L074)
- ML20138L075 + (ML20138L075)
- ML20138L076 + (ML20138L076)
- ML20138L077 + (ML20138L077)
- IR 05000213/1985020 + (ML20138L078)
- ML20138L080 + (ML20138L080)
- ML20138L081 + (ML20138L081)
- ML20138L082 + (ML20138L082)
- ML20138L083 + (ML20138L083)
- ML20138L084 + (ML20138L084)
- IR 05000455/1985031 + (ML20138L086)
- ML20138L088 + (ML20138L088)
- ML20138L090 + (ML20138L090)
- BSEP-85-1760, Advises That Completion Date for Maint Surveillance Test Procedure Program Revised to 860131,in Response to Insp Repts 50-324/84-31 & 50-325/84-31.Commitment Schedule Encl + (ML20138L091)
- IR 05000454/1985047 + (ML20138L093)
- ML20138L094 + (ML20138L094)
- ML20138L101 + (ML20138L101)