ML20138L070

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-213/85-20 on 850918-23.Insp Identified Component Malfunctions & Design Deficiencies in Automatic Auxiliary Feedwater Actuation Sys.Mgt Meeting Scheduled on 851031 at Region I Ofc
Date released: 05/31/2020 Download: ML20138L070


Insp Rept 50-213/85-20 on 850918-23.Major Areas Inspected: Circumstances & Corrective Actions Re Auxiliary Feedwater Actuation Component Failure.Mgt Meeting Scheduled to Discuss Corrective Actions
ML20138L078
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 10/24/1985
From: Mccabe E, Swetland P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
Download: ML20138L078 (8)
Forwards Insp Rept 50-213/85-20 on 850918-23.Insp Identified Component Malfunctions & Design Deficiencies in Automatic Auxiliary Feedwater Actuation Sys.Mgt Meeting Scheduled on 851031 at Region I Ofc
ML20138L065
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 10/25/1985
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: OPEKA J F
CONNECTICUT YANKEE ATOMIC POWER CO.
References
Download: ML20138L065 (2)