Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137Y505 + (ML20137Y505)
- ML20137Y507 + (ML20137Y507)
- ML20137Y509 + (ML20137Y509)
- ML20137Y512 + (ML20137Y512)
- ML20137Y513 + (ML20137Y513)
- ML20137Y514 + (ML20137Y514)
- ML20137Y516 + (ML20137Y516)
- ML20137Y518 + (ML20137Y518)
- U-600323, Submits Info Re Status of Design Const & Preoperational Testing Per FSAR & NRC Regulations.Fuel Loading Between Late Feb & Mar 1986 Anticipated.Const Approx 98.5% Complete as of 851130.All Sys Turned Over to Util for Testing + (ML20137Y522)
- ML20137Y524 + (ML20137Y524)
- ML20137Y525 + (ML20137Y525)
- ML20137Y526 + (ML20137Y526)
- ML20137Y528 + (ML20137Y528)
- ML20137Y529 + (ML20137Y529)
- ML20137Y530 + (ML20137Y530)
- ML20137Y534 + (ML20137Y534)
- ML20137Y535 + (ML20137Y535)
- IR 05000331/1985016 + (ML20137Y539)
- ML20137Y540 + (ML20137Y540)
- ML20137Y542 + (ML20137Y542)
- ML20137Y544 + (ML20137Y544)
- ML20137Y545 + (ML20137Y545)
- ML20137Y546 + (ML20137Y546)
- ML20137Y549 + (ML20137Y549)
- ML20137Y550 + (ML20137Y550)
- ML20137Y552 + (ML20137Y552)
- ML20137Y553 + (ML20137Y553)
- ML20137Y554 + (ML20137Y554)
- ML20137Y555 + (ML20137Y555)
- ML20137Y556 + (ML20137Y556)
- PLA-2493, Declines 841217 Request to Participate in Development Project for NRC Emergency Response Data Sys.No Significant Emergency Mgt Benefit Anticipated to Offset Potential Costs Associated W/Involvement in Effort + (ML20137Y558)
- ML20137Y560 + (ML20137Y560)
- ML20137Y562 + (ML20137Y562)
- NSD-NRC-97-5069, Requests That Staff Provide Data from Two Rosa Tests AP-BO-01 & AP-CL-04 Which Includes Sys Pressure PRHR Flow, PRHR Inlet & Outlet Fluid Temps,Prhr Tubes Surface Temps & IRWST Temps as Function of Time for Completion of SSAR + (ML20137Y564)
- ML20137Y565 + (ML20137Y565)
- ML20137Y569 + (ML20137Y569)
- NSD-NRC-97-5066, Forwards Markups of SSAR Subsections 5.4.8 & 3.9.6.2.2 That Address Open Items Associated W/Dser Subsection 3.9.6 That Have Been Closed + (ML20137Y570)
- ML20137Y571 + (ML20137Y571)
- ML20137Y573 + (ML20137Y573)
- NG-97-0578, Informs That Implementation of DAEC ITS Planned for Fourth Quarter of 1997 + (ML20137Y574)
- ML20137Y576 + (ML20137Y576)
- B11748, Informs That Preservice Insp of All Piping Welds in Break Exclusion Area Completed & Documented as Acceptable,Per SER Confirmatory Item 7.Results of Insps Will Be Used in Program to Meet ASME Section XI Requirements + (ML20137Y577)
- 05000261/LER-1986-007-02, :on 860131,common Hydraulic Fluid Reservoir & Associated Tubing for Each Bank of Four Snubbers Observed to Be Empty.Caused by Improperly Tightened Fitting.Hydraulic Fluid Sys Will Be Pressure Tested + (ML20137Y578)
- ML20137Y579 + (ML20137Y579)
- ML20137Y580 + (ML20137Y580)
- ML20137Y582 + (ML20137Y582)
- 05000498/LER-1994-019-01, Forwards LER 94-019-01,removing Commitment to Revise SI Actuation & Response Time Test Surveillance Procedure to Include spin-up Time for Fuel Handling Bldg HVAC Sys + (ML20137Y584)
- ML20137Y586 + (ML20137Y586)
- ML20137Y587 + (ML20137Y587)
- ML20137Y589 + (ML20137Y589)
- ML20137Y590 + (ML20137Y590)