ML20137Y576

From kanterella
Jump to navigation Jump to search
Provides Info Concerning Access of NRC Contractors to Facility for Purpose of Conducting Design Insp.Onsite Phase of Visit at Plant Scheduled for 961118-970110.Partially Deleted Info Encl
ML20137Y576
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/15/1996
From: Shaw P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Plunkett T
FLORIDA POWER & LIGHT CO.
Shared Package
ML20137Y003 List:
References
FOIA-96-485 NUDOCS 9704230139
Download: ML20137Y576 (3)


Text

. - - -

-...-...._...,_4-

- - )

g

_~.u..

.a

'y/

November 15,1996 1

Florida Power and Light Company 4

c.

i ATTN: Mr. T. F. Plunkett

'I President - Nuclear Division P. O. Box 14000

.T 4

l Juno Beach. FL 33408-0420

~

\\

SUBJECT:

NRC PERSONNEL ACCESS ST. LUCIE NUCLEAR PLANT (DOCKET NO. 50-335 AND 50-389) l Gentlemen:

This letter is to provide information concerning access of NRC contractors to i

your facility for the purpose of conducting a design inspection.

The onsite phase of the visit at St. Lucie is scheduled for November 18. 1996, through January 10. 1997.

The Enclosure lists the NRC contractors who will be visiting your facility.

i For those individuals, who have a clearance and have completed appropriate training, we request' unescorted access to your vital and protected areas.

For all others listed, we request escorted access.

This does not preclude the granting of a higher level of access, consistent with your approved Security Plan, if you so choose.

This letter does not supersede our previous correspondence dated October 1.

1 1996, regarding NRC personnel access; however, as indicated on the Enclosure.

it provides identification of additional personnel who should only be-j permitted access for the dates specified in the above paragraph.

1 Should you have any questions concerning this matter we will be happy to i

discuss them with you, i

FOR THE REGIONAL ADMINISTRATOR i

(original signed by Peggy R. shaw) 9704230139 970417 PDR FOIA Peggy R. Shaw BINDER 96-485 PDR 33 g

g3 (34 g

)

Enclosure:

Access List cc w/ enc 1:

(See Page 2)

/

Informatica in this ra:std was de!ated h

in sccardance with the Fra: dom of information l/g/j \\

Act, exemplicas 6 FoiA-f*M

\\y 9704/ 230/3 y..

. ~.

. DSS 14: 09 841 5510 US fAC RO 11

  1. d 5

i a.

n i

J<

i da a

j FP&L 2

cc w/ensis J. A. stall, Vice.Preeldent J. Scerols,'Plent taeneral Manager W. G. White, site locurity

~

?

Seervleer l

otatethusfan n/anntt l

M. Mll Lor, NRC Besidsnt inspeeter (St. Lumfe) t I

1 t

1 1

I 1

1 4

~

l i

l

{-

1

!l' ElCE BEPAS A GN4ttil Ematuns

{ ~l JE WIE likeW1 Penhow OATE 11/']/ /N 11/

/N 11/

/N 11/

/96 11/

/M 11/

/M 11/

[M rven i un vna un van un vsa un van un vse un vna we Gesctu asen Voopy sou m eur ums: P \\1114.m

.s96 14:09 B41 5510 US NRC RG 1I P. Or.

i

..e,g.,.

i u

' W LtXIIE'

~

S i

This. certifies that all individuals listed below are employees of a actor to the.NRC for purposes of assisting the NRC during the inspection.

$ and

.have completed site access training with the NRC. or a nuclear powe p site.

e last 12 months and should be granted unescorted access.

have not completed site access training and should be provi escorted access Tne NRC Division of Security has completed a security assurance interview a criminal history check and credit check of the following esployees with satisfactory resulto Ori the basis of this inftemmertwrc theletDtytsterrof Seetsrttyteraccordance wit 6)""'"

i Directive 12.3 "Erusccual Secucity Proggeos? has determinedthat the esp eligible for tenporsareeste-ted access p ia, compfetion of' the required'

_J' inveastigations.

I With regard to psychological testing. all of the employees have successfully completed a Minnesota Multiplistic Personality Inventory (MMPI) administered by Standard Associates Contractor SAT SSN Emolovee Sito/Date Emolover Number citi7enshio Millstone S&L M

I6 I

10/10/96 j

None S&L M

None S&L sades S&L

]

$1 All of the contractor employees will submit and are subject to the utility's fitness-fca-duty program, 4

i l

1 1

4 0

Enclosure

-