Forwards Safety Insp Rept 50-331/85-16 on 851028-30.No Violation Noted.Response to Weaknesses Identified Re Utilization of Post Accident Sampling Sys Requested within 45 Days of Ltr Date
ML20137Y530
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 11/27/1985
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Leslie Liu
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
Shared Package
ML20137Y535 List:
References
NUDOCS 8512110070
Download: ML20137Y530 (3)


See also: IR 05000331/1985016

Text

  • L

-

h~ 1-

> <

NOV 2 'l 985

Docket No.~ 50-331

Iowa Electric Light and Power

Company

-ATTN: Mr. Lee Liu

' President and Chief

Executive Officer

IE Towers

P. 0.: Box.351

.

Cedar Rapids, IA 52406~

.

Gentlemen:

'.This . refers to the routine safety inspection conducted by Mr. J. P. Patterson

and others of this office.on October 28-30, 1985, of activities at the Duane

Arnold Energy Center authorized by NRC Operating License No. DPR-49, and to

the' discussion of our findings with Messrs. R. McGaughy, D. Mineck, and others

'of your_ staff at the conclusion of the inspection.

-

The enclosed copy of our. inspection report identifies areas examined during 4

the inspection. Within these areas, the_ inspection consisted of a selective

-examination _of procedures and representative records, observations, and-

interviews'with-personnel.

No~ violations of NRC requirements were identified during the course of this

inspection. However;' weaknesses were identified which will require corrective

>

_ action by your staff. These weaknesses are. summarized in the appendix to.this

-letter. As required by 10 CFR Part 50, Appendix E (IV.F), any weaknesses that

are-identified must be corrected. Accordingly, please-advise us within 45 days

of the date.of this letter of the corrective action you have taken, or plan'to

take, showing.the estimated date of; completion.

In accordance with'10 CFR 2.790 of the Commission's regulations, a copy of

.this letter and the enclosures will be placed in the NRC's Public' Document

Room.

-The response. directed by this letter is not subject to the clearance procedures

~

.of the Office of Management and Budget as required by the Paperwork Reduction

lAct, PL 96-511.

2

M

/

B512110070

DR

851127

ADOCK 05000331 iI .

PDR  !

i

Le_ _..

.

.

.

Iowa Electric Light and Power Company 2 NOV 2 7.1985;

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

" Original signed by ED. Shafer"

W. D. Shafer, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosures:

1. Appendix - Exercise Weaknesses

2. Inspection Report

No. 50-331/85016(DRSS)

cc w/ enclosures:

.D. Mineck, Plant Superintendent,

Nuclear

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Thomas Houvenagle, Iowa State

Commerce Commission

M. Collins, FEMA, Region VII

D. Matthews, EPB, 0IE

,

RIII P RII RI I RII@ RI I

PattVrson/jlk Wi1Tiamse SMth - P i lips Bo d S er

11/20/85

. - .

.

-

.

,

Appendix

EXERCISE WEAKNESSES

1. Utilization of the Post Accident Sampling System (PASS), as demonstrated by

a two person team was unsatisfactory. The total time from when the team

was dispatched until the sample results were obtained was approximately

5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. Open Item No. 331/85016-01 (Section 4.c).

2. One of the Offsite Radiological Monitoring Teams (RMTs) lost communications

with the Emergency Operations Facility (EOF) and the other RMT for

approximately 1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Open Item No.'331/85016-02 (Section 4.f).

3. One of the Offsite Radiological Monitoring Teams failed to follow EPIPs

2.6 and 3.2 in the' collection, packaging,'and identification of soil,

water, -and vegetation samples. Open Item.No. 331/85016-03 (Section 4.f).

.

e

i

, - - - - - - - -~