Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000304/LER-1985-025-05, :on 851023,three Steam Generator D narrow-range Level Transmitters Found Out of Tolerance,Due to Instrument Drift Refueling Calibr.Transmitters Replaced Under Mod M22-1(2)-85-21 + (ML20137G519)
- ML20137G522 + (ML20137G522)
- ML20137G524 + (ML20137G524)
- B16307, Provides Response to Violations Noted in Insp Repts 50-245/96-13,50-336/96-13 & 50-423/96-13.Corrective Actions: Steam Tunnel Will Not Be Isolated from Reactor Bldg Since No Potential Exists for HELB Event to Ensure Compliance + (ML20137G525)
- ML20137G527 + (ML20137G527)
- ML20137G530 + (ML20137G530)
- PNO-I-86-002, on 860109,fire Protection Deluge Sys for Auxiliary Transformer Manually Actuated by Unknown Person at Local Fire Box.Caused by Intentional Act of Tampering or Harassment.Addl Security Patrols Instituted + (ML20137G531)
- 3F0397-19, Forwards Sys Readiness Review Plan & Schedule for Completion of Plan,Per Request + (ML20137G532)
- ML20137G536 + (ML20137G536)
- ML20137G537 + (ML20137G537)
- ML20137G540 + (ML20137G540)
- ML20137G541 + (ML20137G541)
- ML20137G545 + (ML20137G545)
- U-600359, Forwards Details Re Termination of Seismic Interaction Program Initiated in Response to Noncompliance Noted in Insp Rept 50-461/80-17 & FSAR Meb Item 3 + (ML20137G548)
- ML20137G552 + (ML20137G552)
- ML20137G553 + (ML20137G553)
- ML20137G555 + (ML20137G555)
- ML20137G557 + (ML20137G557)
- ML20137G562 + (ML20137G562)
- PNO-V-86-003, on 860109,during Full Power Turbine Trip Test Following Turbine Trip/Reactor Trip,Electrical Buses Which Supply Power to Reactor Coolant Pumps Failed to Transfer to Alternate Source.Restart Plans Unknown + (ML20137G563)
- ML20137G564 + (ML20137G564)
- ML20137G567 + (ML20137G567)
- ML20137G570 + (ML20137G570)
- ML20137G572 + (ML20137G572)
- ML20137G576 + (ML20137G576)
- ML20137G577 + (ML20137G577)
- ML20137G578 + (ML20137G578)
- ML20137G580 + (ML20137G580)
- ML20137G581 + (ML20137G581)
- ML20137G583 + (ML20137G583)
- E000-97-011, Discusses Revised Schedule for Completion of MOV Program Review + (ML20137G584)
- ML20137G586 + (ML20137G586)
- ML20137G587 + (ML20137G587)
- 05000373/LER-1997-006-01, :on 970221,DG Testing Did Not Meet Surveillance Requirements,Due to Misinterpretation of Tech Specs. Surveillance Procedures for DG LOCA Load Sequence Testing Being Reviewed + (ML20137G589)
- ML20137G590 + (ML20137G590)
- ML20137G591 + (ML20137G591)
- ML20137G592 + (ML20137G592)
- ML20137G594 + (ML20137G594)
- ML20137G599 + (ML20137G599)
- ML20137G600 + (ML20137G600)
- 05000373/LER-1997-005-02, :on 970220,potential Loss of Both Trains of SGTS & Containment Pressure Suppression During First 10 Seconds of LOCA Noted Due to Deficiencies in Original Design Analysis & Procedures.Design Review Performed + (ML20137G601)
- ML20137G603 + (ML20137G603)
- ML20137G605 + (ML20137G605)
- ML20137G607 + (ML20137G607)
- ML20137G608 + (ML20137G608)
- ML20137G610 + (ML20137G610)
- ML20137G612 + (ML20137G612)
- ML20137G614 + (ML20137G614)
- ML20137G615 + (ML20137G615)
- ML20137G616 + (ML20137G616)
- ML20137G617 + (ML20137G617)