ML20137G583

From kanterella
Jump to navigation Jump to search
Forwards Reactor Containment Bldg Integrated Leak Rate Test, Per 10CFR50,App J.Encl Rept Describes Fifth Integrated Leakage Rate (Type a) Test Conducted During Aug 1985 Cycle 8-9 Refueling Shutdown
Date released: 05/30/2020 Download: ML20137G583


Rev 6 to Procedure 3.17.1, Class a - Integrated Containment Leak Rate Test.
ML20137G592
Person / Time
Site: Maine Yankee
Issue date: 08/15/1985
From:
Maine Yankee
To:
References
Download: ML20137G592 (99)
Reactor Containment Bldg Integrated Leak Rate Test.
ML20137G587
Person / Time
Site: Maine Yankee
Issue date: 08/31/1985
From:
Maine Yankee
To:
References
Download: ML20137G587 (59)
Forwards Reactor Containment Bldg Integrated Leak Rate Test, Per 10CFR50,App J.Encl Rept Describes Fifth Integrated Leakage Rate (Type a) Test Conducted During Aug 1985 Cycle 8-9 Refueling Shutdown
ML20137G580
Person / Time
Site: Maine Yankee
Issue date: 01/07/1986
From: Whittier G
Maine Yankee
To: DENTON H R
Office of Nuclear Reactor Regulation
References
Download: ML20137G580 (1)