Text
paano UNITED STATES 8
a't NUCLEAR REGULATORY COMMISSION t
p WASHINGTON, D. C. 20555 s,... gI PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON NUCLEAR POWER PLANT, UNIT 1 DOCKET N0. 50-275 AMENDMENT TO FACILITY OPERATING LICEF!5E Amendment No. 5 License No. DPR-80 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment dated September 20, 1985, (LAR 85-10) by Pacific Gas & Electric Company (the licensee) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter 1; B.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by a change to the combined Technical Specifications for Units 1 and 2 as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-80 is hereby amended to read as follows:
8601210077 860107 PDR ADOCK 05000275 P
)
. (2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 5, and the Environmental Protection Plan contained in Appendix B are hereby incorporated in the license.
PG&E shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment becomes effective as of the date of its issuance.
FOR THE NUCL R REGULATORY COMMISSION (5Asa>
Stp'ven A. V
, Director PWR Project Directorate #3 Division of PWR Licensing-A
Attachment:
Changes to the Technical Specifications Date of Issuance: January 7,1986
- punuq%
UNITED STATES
,7 NUCLEAR REGULATORY COMMISSION 3
o r,
j WASHINGTON, D. C. 20555
\\*****/
PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON NUCLEAR POWER PLANT, UNIT 2 DOCKET NO. 50-323 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 3 License No. DPR-82 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment dated September 20, 1985, (LAR 85-10) by Pacific Gas & Electric Company (the licensee) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter 1; B.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by a change to the combined Technical Specifications for Units 1 and 2 as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-82 is hereby amended to read as follows:
l
. (2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 3, and the Environmental Protection Plan contained in Appendix B are hereby incorporated in the license.
PG&E shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment becomes effective as of the date of its issuance.
FOR THE N EAR REGULATORY COMMISSION f
\\-
w.
Steven A. Var irector P
Project Directorate #3 Di (sion of PWR Licensing-A
Attachment:
Changes to the Technical Specifications Date of Issuance: January 7, 1986
)
. _ _ _ _ _ _ _ _ _ _.. ~ -
January 7,1986 ATTACHMENT TO LICENSE AMENDMENT NOS. 5 AND 3 FACILITY OPERATING LICENSE NOS. DPR-80 AND DPR-82 DOCKET NOS. 50-275 AND 50-323 Revise the following pages of the Appendix A Technical Specifications with the enclosed pages. The revised pages are identified by Amendment Number and contain vertical lines ir.diciating the area of change.
Remove Page Insert Pages 3/4 7-18 3/4 7-18
PLANT SYSTEMS 3/4.7.7 SNUBBERS LIMITING CONDITION FOR OPERATION 3.7.7.1 All snubbers shall be OPERABLE.
The only snubbers excluded from this requirement are those installed on nonsafety-related systems and then only if their failure or failure of the system on which they are installed would have no adverse effect on any safety-related system.
APPLICABILITY:
MODES 1, 2, 3, and 4.
MODES 5 and 6 for snubbers located on systems required OPERABLE in those MODES.
ACTION:
With one or more snubbers inoperable on any systen, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> replace or restore the inoperable snubber (s) to OPERABLE status and perform an engineering evaluation per Specification 4.7.7.19. on the attached component or declare the attached system inoperable and follow the appropriate ACh0N statement for that system.
SURVEILLANCE REQUIREMENTS 4.7.7.1 Each snubber shall be demonstrated OPERABLE by performance of the fol-lowing augmented inservice inspection program and the requirements of Specification 4.0.5.
a.
Inspection Types I
As used in this specification, type of snubber shall mean snubbers l
of the same design and manufacturer, irrespective of capacity.
b.
Visual Inspections Snubbers are categorized as inaccessible or accessible during reactor operation.
Each of these groups (inaccessible and accessible) may be inspected independently according to the schedule below.
The first inservice visual inspection of each type of snubber shall be performed after completion of the power ascension test program or 4 months but within 10 aonths of commencing POWER OPERATION and shall include all snubbers.
If all snubbers of each type are found OPERABLE during the first inservice visual inspection, the second inservice visual inspec-tion of that type shall be performed at the first refueling outage.
Otherwise, subsequent visual inspections shall be performed in accor-dance with the following schedule:
DIABLO CANYON - UNITS 1 & 2 3/4 7-18 Amendment Nos 5 & 3