ML20137G608
| ML20137G608 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 01/13/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20137G612 | List: |
| References | |
| NUDOCS 8601210114 | |
| Download: ML20137G608 (2) | |
See also: IR 05000298/1985032
Text
-
.
JAN 131986 -
In Reply Refer To:
Docket:
50-298/85-32
Nebraska Public Power District
ATTN:
J. M. Pflant, Manager, Technical
Staff-Nuclear Power Group
P. O. Box 499
Columbus, Nebraska 68601
Gentlemen:
This refers to the inspection conducted by W. M. McNeill of this office during
the period December 2-6, 1985, of activities authorized by NRC Operating
License DPR-46 for Cooper Nuclear Station, and to the discussion of our
findings with Mr. G. Sayer and other members of your staff at the conclusion
c,f the inspection.
Area examined during the inspection was the calibration program.
Within this
area, the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the
inspector.
These findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the arovisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
I
!/
RIV:RPB/A4**
RPB/A
RPB
WMMcNeill:sj
JPJau o
JEGag virdo
/ / 9/86
[ /d' /86
1/;c b 5
!
$$21"iEocA$#h
\\[f
a
i '
._
m
- .
,
u
Nebraska Public Power District
-2-
L
Should you have any questions concerning this inspection, we will be pleased to
'
discuss them with you.
"
Sincerely,
Orichi! SMned By'
1
. E. Gegiardo ~
'
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
- 1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-298/85-32
Guy Horn, Division Manager
of Nuclear Operations
Cooper Nuclear Station
P. O. Box 98
Brownville, Nebraska 68321
Kansas-Radiation Control Program Director
Nebraska Rcdiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RPR
DRSP
- Resident Inspector
R. D. Martin, RA
- Section Chief (RPB/A)
- D. Weiss, LFMB (AR-2015
- R&SPB
- RSB
- MIS System
- W. M. McNeill
- RIV File
..
I
- RSTS Operator
- w/766
1