Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137A058 + (ML20137A058)
- 05000245/LER-1997-011-01, :on 970214,discovered TS Surveillance Requirement 4.7.A.3.d,containment Airlock Leakage Rate Test, Exceeded.Caused by Personnel Error.Unit Surveillance Coordinator Rescheduled Containment Airlock Leak Rate Test + (ML20137A060)
- ML20137A066 + (ML20137A066)
- ML20137A067 + (ML20137A067)
- ML20137A068 + (ML20137A068)
- ML20137A072 + (ML20137A072)
- ML20137A074 + (ML20137A074)
- PNO-V-86-001, on 860102,unusual Event Declared When Reactor Tripped on lo-lo Steam Generator Level Following Feedwater Pump Trip.Caused by Reactor Coolant Pumps Tripping on Undervoltage.Pumps Restarted in 3 to 5 Minutes + (ML20137A077)
- ML20137A080 + (ML20137A080)
- ML20137A082 + (ML20137A082)
- U-602701, Forwards Rev 5 to App IV Second 10-Yr Interval Inservice Exam Plan & Rev 19 to App V Second 10-Yr Interval Pump & Valve Testing Program Plan + (ML20137A083)
- PNO-IV-86-002B, NRC Augmented Investigation Team Analysis of Info Re 860104 Rupture of Cylinder Containing Approx 15 Tons UF6 Indicates Cylinder Failed Due to Hydraulic Rupture. Cylinder Not Defective.Cleanup Continuing + (ML20137A085)
- ML20137A088 + (ML20137A088)
- ML20137A091 + (ML20137A091)
- ML20137A097 + (ML20137A097)
- ML20137A099 + (ML20137A099)
- ML20137A102 + (ML20137A102)
- ML20137A104 + (ML20137A104)
- ML20137A107 + (ML20137A107)
- ML20137A110 + (ML20137A110)
- ST-HL-AE-1573, Forwards marked-up Response to Draft SER Item 61N Re post-accident Sampling Predicted Personnel Exposures (NUREG-0737,II.B.3,Item 6).Info Will Be Incorporated Into Future FSAR Amend + (ML20137A111)
- ML20137A112 + (ML20137A112)
- ML20137A115 + (ML20137A115)
- ML20137A117 + (ML20137A117)
- NUREG-0669, Responds to Requests for Clarification & Guidance Re Provisions of Licensee Safeguards Guidance Group Bulletin 38.Bulletin Amplifies Importance of Maintaining Integrity of Matl Access Fixed Barriers + (ML20137A118)
- ML20137A119 + (ML20137A119)
- ML20137A122 + (ML20137A122)
- ML20137A125 + (ML20137A125)
- IR 05000267/1985022 + (ML20137A129)
- 05000331/LER-1997-002, :on 970207,both Standby Gas Treatment Trains Were Inoperable Due to Low Carbon Bed Efficiencies.Approx 80 Pounds of Carbon Was Added to Each Train of SBGT Sys & Each Train Was Retested W/Satisfactory Results + (ML20137A130)
- IR 05000395/1985039 + (ML20137A132)
- ML20137A133 + (ML20137A133)
- U-602712, Provides 180-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs + (ML20137A135)
- ML20137A136 + (ML20137A136)
- ML20137A139 + (ML20137A139)
- ML20137A140 + (ML20137A140)
- PNO-III-86-001, on 860108,fire Destroyed Warehouse Bldg Outside Protected Area at Facility.Cause of Fire Undetermined.No Injuries Reported.No Radioactive Matl Involved.State of Mo & Region III Notified + (ML20137A142)
- ML20137A144 + (ML20137A144)
- ML20137A146 + (ML20137A146)
- ML20137A148 + (ML20137A148)
- ML20137A151 + (ML20137A151)
- ML20137A152 + (ML20137A152)
- ML20137A154 + (ML20137A154)
- 3F0186-11, Forwards Rev 0 to Process Control Program, Reflecting Change from Chem-Nuclear Solidification Sys to Bartlett Nuclear Sys.Comments Requested by 860314 + (ML20137A155)
- ML20137A156 + (ML20137A156)
- IA-85-524, Responds to FOIA Request for Last Two NRC Insp Repts for St James Hosp in Chicago Heights,Il.Documents Listed on Encl App Available in PDR + (ML20137A156)
- ML20137A159 + (ML20137A159)
- ML20137A160 + (ML20137A160)
- ML20137A163 + (ML20137A163)
- ML20137A164 + (ML20137A164)
- 05000341/LER-1985-074, :on 851019,portion of Div II ECCS & Emergency Diesel Generator Relay Logic Actuated,Causing Core Spray Sys to Inject Water Into Reactor Pressure Vessel + (ML20137A165)