Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000293/LER-1997-002, :on 970206,SJAE Sampling Was Not Performed in Accordance with Ts.Caused by Improper Conclusion Contained in Response to Request for Licensing Interpretation in 1990. Validation Project Is Now Complete + (ML20136H240)
- ML20136H241 + (ML20136H241)
- ML20136H243 + (ML20136H243)
- ML20136H244 + (ML20136H244)
- ML20136H245 + (ML20136H245)
- ML20136H247 + (ML20136H247)
- ML20136H248 + (ML20136H248)
- 05000285/LER-1996-005, :on 960615,tornado Venting Floor Panels Encumbered by Various Attachments.Caused by Inadequate Initial Construction & Lack of Detailed Design Info for Auxiliary Building.Encumbrances Removed + (ML20136H249)
- ML20136H251 + (ML20136H251)
- ML20136H252 + (ML20136H252)
- 05000245/LER-1997-009, Forwards LER 97-009-00,documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 970212.Util Commitments Made within Ltr,Listed + (ML20136H253)
- IR 05000264/1976003 + (ML20136H255)
- ML20136H256 + (ML20136H256)
- ML20136H257 + (ML20136H257)
- ML20136H259 + (ML20136H259)
- AECM-85-0365, Endorses Evaluation of TVA Igniter Spray Tests Submitted on 851031 to Close Hydrogen Control Owners Group Program Plan,Subtask 6.26 & All Other Work Associated W/Task 6. Task 3 in Progress,Awaiting Completion of Subtask 3.12 + (ML20136H260)
- ML20136H261 + (ML20136H261)
- ML20136H262 + (ML20136H262)
- IR 05000461/1985051 + (ML20136H264)
- ML20136H265 + (ML20136H265)
- ML20136H266 + (ML20136H266)
- ML20136H267 + (ML20136H267)
- ML20136H268 + (ML20136H268)
- ML20136H269 + (ML20136H269)
- ML20136H270 + (ML20136H270)
- ML20136H271 + (ML20136H271)
- IR 05000219/1985032 + (ML20136H272)
- 05000245/LER-1997-009-01, :on 970212,reactor low-low Level ECCS & Primary Containment Initiation Setpoints Were Not Conservative. Caused by Deficient Setpoint Methodology.Calculations Will Be Revised & TS Change Initiated + (ML20136H274)
- ML20136H275 + (ML20136H275)
- ML20136H277 + (ML20136H277)
- ML20136H278 + (ML20136H278)
- 05000353/LER-1997-002-01, :on 970212,leakage Was Identified from 2 Inch Reactor Pressure Vessel Instrument Nozzle.Caused by Improper installation.N12B Connection Was Removed & Sent off-site for Analysis + (ML20136H280)
- ML20136H281 + (ML20136H281)
- ML20136H282 + (ML20136H282)
- ML20136H283 + (ML20136H283)
- ML20136H284 + (ML20136H284)
- ML20136H286 + (ML20136H286)
- ML20136H289 + (ML20136H289)
- CY-97-044, Forwards Comments on SECY-97-044, Policy & Key Technical Issues Pertaining to Westinghouse AP600 Standard Pressurized Reactor Design + (ML20136H291)
- IR 05000264/1977001 + (ML20136H292)
- ML20136H293 + (ML20136H293)
- ML20136H294 + (ML20136H294)
- ML20136H296 + (ML20136H296)
- ML20136H297 + (ML20136H297)
- ML20136H298 + (ML20136H298)
- ML20136H300 + (ML20136H300)
- ML20136H301 + (ML20136H301)
- ML20136H302 + (ML20136H302)
- ML20136H305 + (ML20136H305)
- ML20136H308 + (ML20136H308)
- ML20136H309 + (ML20136H309)