ML20136H296

From kanterella
Jump to navigation Jump to search
Revised Final Deficiency Rept Re Failure of Ingersoll Rand Air Compressor Motor.Initially Reported on 821209. Replacement Motors Will Be in Place No Later than 6 Months Before Fuel Loading
ML20136H296
Person / Time
Site: Bellefonte Tennessee Valley Authority icon.png
Issue date: 10/31/1985
From: Hufham J
TENNESSEE VALLEY AUTHORITY
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8511250078
Download: ML20136H296 (1)


Text

,

TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 37401 is[

400 Chestnut Street Tower II B5 t!8yskergg,may i

BLRD-50-438/83-02 U.S. Nuclear Regulatory Conumission Region II l

'. Attn:

Dr. J. Nelson Grace, Regional Administrator l

101 Marietta Street, NW, Suite 2900 L

Atlanta, Georgia 30323 j

Dear Dr. Grace:

l BELLEFONTE NUCLEAR PLANT UNITS FAILURE OF AIR COMPRESSOR MOTOR - INGERSOLL RAND - BLRD-50-438/83 REVISED FINAL REPORT l-

'The subject deficiency was initially reported to NRC-OIE Inspector P. E. Fredrickson~on December 9, 1982 in accordance with 10 CFR 50.55(e) as NCR 2102. This was followed by our interim reports dated January 7 and May 26, 1983 and January 9 and October 3, 1984. Our final report was submitted on April 15, 1985. Related NCRs 2285 and 2535 had also been reported and are now being included as part of this 50.55(e) concern. Below is our revised final report.

As discussed with NRC-0IE Region II Inspector Al Ignatonis on October 25, 1985, the date of October 23, 1985 for completion of corrective actions indicated in our final report on this matter was not met because Reliance Electric has delayed delivery of the replacement motors.

In addition, we have decided to store the motors upon receipt and install them inusediately before RJ system testing and transfer. Accordingly, the replacement motors will be in place no later than six months before fuel loading.

If -you have any questions, plea:. get in touch with R. H. Shell'at FTS 858-2688.

l-Very truly yours, TENNESSEE VALLEY AUTHORITY if.w.nufham, Man *a8 Licensing and Risk Protection ec:

Mr. James Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, suite 1500 Atlanta, Georgia 30339 8511250078 851031 PDR ADOCK 05000438 j

S PDR i d An Equal Opportunity Employer I