ML20136H294

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Feb 1997 for Millstone Nuclear Power Station,Unit 2 & Revised Monthly Operating Rept for Jan 1997
ML20136H294
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/13/1997
From: Price J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20136H298 List:
References
B16320, NUDOCS 9703190108
Download: ML20136H294 (2)


Text

. -. ~ - . -

\ Roge Feny Rd. (Houte 156), Watufterd, CF 00385 Northeast

. Nuclear Energy uaistone suaear vom station

. Northeast Nuclear Energy Company P.O. Ikx 128 Waterfont, Ur 06335-0128 (860) 447-1791  :

Fax (860) 444-4277 The Northeast Utilities System i

1 W I 31997 Docket No. 50-336 i B16320 I

U.S. Nuclear Regulatory Commissiori '

Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit No. 2 Facility Operating License No DPR-65 Monthlv Operatino Report l

In accordance with the reporting requirements of Technical Specification Section 6.9.1.7 for Millstone Unit No. 2, enclosed, in Attachment 1, is the monthly operating report for the month of February 1997.

The unit shutdown and power reduction duration for January 1997 has been revised and is provided in Attachment 2.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

.w J.A. iPe ire r, MHist ne Unit No. 2 190069 ,,

cc: H. J. Miller, Region I Administrator D. G. Mcdonald, Jr., NRC Project Manager, Millstone Unit No. 2 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 Dr. W. D. Travers, Director, Special Projects 9703190108 970313  !

PDR ADOCK 05000336j R_,,,,.,,,_,,,,, PDR 3 l ggg ggg