Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000414/1985034 + (ML20135F934)
- ML20135F935 + (ML20135F935)
- ML20135F938 + (ML20135F938)
- ML20135F940 + (ML20135F940)
- ML20135F942 + (ML20135F942)
- ML20135F944 + (ML20135F944)
- ML20135F945 + (ML20135F945)
- ML20135F947 + (ML20135F947)
- ML20135F949 + (ML20135F949)
- ML20135F950 + (ML20135F950)
- ML20135F952 + (ML20135F952)
- ML20135F953 + (ML20135F953)
- 05000295/LER-1985-031-04, :on 850814,penetration Pressurization Low Pressure Alarm Received & Zone 4 Pressure Observed Below Required 47 Psig.Caused by Leaking Weld Channels & Relief Valve.Channels Isolated & Valve Repaired + (ML20135F954)
- ML20135F955 + (ML20135F955)
- ML20135F958 + (ML20135F958)
- ML20135F959 + (ML20135F959)
- ML20135F960 + (ML20135F960)
- ML20135F961 + (ML20135F961)
- 05000341/LER-1985-046, :on 850813,reactor Water Cleanup Sys Isolated Due to High Differential Flow Signal.Caused by Effects of Changing Condenser Back Pressure.Flow Limited to 30 Gpm Max Until Basis for Calibr Reevaluated + (ML20135F962)
- ML20135F964 + (ML20135F964)
- 05000387/LER-1985-026, :on 850624,during Testing of HPCI Sys,Oil Leak Discovered on HPCI Steam Stop Valve Oil Supply Flange. Caused by Loose Nuts Securing Stop Valve Oil Supply Flange. Nuts Torqued & Leak Test Performed + (ML20135F965)
- ML20135F966 + (ML20135F966)
- HL-5351, Responds to NRC Re Violations Noted in Insp Repts 50-321/96-10 & 50-336/96-10.Corrective Actions:Operations & Training Departments Were Provided Addl Guidance + (ML20135F969)
- ML20135F971 + (ML20135F971)
- ML20135F973 + (ML20135F973)
- ML20135F974 + (ML20135F974)
- ML20135F975 + (ML20135F975)
- 05000302/LER-1985-011, :on 850812,sump Pump Operability Verification & Breaker Alignment Verification Not Performed During Emergency Generator Maint.Caused by Operator Error. Surveillance Performed.Procedures Changed + (ML20135F976)
- ML20135F977 + (ML20135F977)
- IR 05000498/1996024 + (ML20135F978)
- ML20135F980 + (ML20135F980)
- ML20135F981 + (ML20135F981)
- ML20135F982 + (ML20135F982)
- 05000255/LER-1985-011, :on 850812,w/plant in Hot Shutdown,Safety Injection Sys Actuation Initiated During Maint Evolution. Caused by Personnel Error.Responsible Engineer Counseled on Circuit Configuration + (ML20135F983)
- ML20135F984 + (ML20135F984)
- ML20135F985 + (ML20135F985)
- ML20135F986 + (ML20135F986)
- ML20135F987 + (ML20135F987)
- ML20135F990 + (ML20135F990)
- ML20135F992 + (ML20135F992)
- ML20135F994 + (ML20135F994)
- ML20135F995 + (ML20135F995)
- ML20135F997 + (ML20135F997)
- ML20135F998 + (ML20135F998)
- ML20135G000 + (ML20135G000)
- ML20135G001 + (ML20135G001)
- ML20135G002 + (ML20135G002)
- 05000366/LER-1985-022-01, :on 850814,personnel Determined That Monthly Channel Check for Drywell High Range Pressure & Radiation Instrumentation Not Performed Per Tech Specs. Caused by Personnel Error + (ML20135G004)
- IA-97-195, Final Response to FOIA Request for Documents.Forwards Documents Listed in App a Being Made Available in PDR + (ML20135G007)
- ML20135G007 + (ML20135G007)
- ML20135G008 + (ML20135G008)