Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TXX-4545, Updates Util Re Max Allowable Time for Operator Action Following Control Room/Cable Spreading Room Fire, Concurrent W/Loss of Offsite Power.Safe Shutdown Equipment in UPS Room Operable More than 10 Minutes W/O Ventilation + (ML20135A310)
- PNO-III-85-077, on 850904,leak Rate Test Connection Valve Installed on 850620 in Containment Sampling Sys Found Open & Attached Line Uncapped,Due to Unrevised Containment Valve Lineup Procedure.Valve Closed + (ML20135A312)
- ML20135A314 + (ML20135A314)
- ML20135A315 + (ML20135A315)
- ML20135A316 + (ML20135A316)
- ML20135A317 + (ML20135A317)
- ML20135A318 + (ML20135A318)
- ML20135A319 + (ML20135A319)
- ML20135A321 + (ML20135A321)
- ML20135A323 + (ML20135A323)
- ML20135A324 + (ML20135A324)
- B16229, Responds to NRC Request for Info Identified at 961217 Meeting W/Util.Current Director,Unit Operations for Unit 1 Meets Qualifications for Position + (ML20135A326)
- IR 05000412/1985007 + (ML20135A328)
- ML20135A329 + (ML20135A329)
- ML20135A330 + (ML20135A330)
- ML20135A331 + (ML20135A331)
- ML20135A333 + (ML20135A333)
- ML20135A335 + (ML20135A335)
- 05000373/LER-1996-008-01, :on 960628,all Cscs,Eccs & DGs Declared Inoperable Due to Foreign Matl Injected Into Svc Water Tunnel.Caused by Inadequate Work Control.Tunnel Cleaned & Inspected,Floor & Wall Repair Work Stopped + (ML20135A337)
- ML20135A339 + (ML20135A339)
- ML20135A341 + (ML20135A341)
- 05000423/LER-1996-043-01, :on 961024,internal Audit Identified Potential Inconsistency W/Interpretation of TS Requirements. Inconsistencies Confirmed on 961107.Caused by Operator Misunderstanding of TS Compliance.Procedures Revised + (ML20135A342)
- ML20135A344 + (ML20135A344)
- ML20135A346 + (ML20135A346)
- ML20135A347 + (ML20135A347)
- ML20135A348 + (ML20135A348)
- ML20135A349 + (ML20135A349)
- ML20135A350 + (ML20135A350)
- ML20135A351 + (ML20135A351)
- IR 05000609/2008010 + (ML20135A353)
- ML20135A354 + (ML20135A354)
- 05000482/LER-1996-017, :on 961029,licensee Failed to Comply W/Ts SR 4.3.3.5.2.Caused by Lack of Knowledge of Function of Isolation Switch.Actuated Components Using ASP Isolation Switches Were Functionally Tested + (ML20135A355)
- ML20135A358 + (ML20135A358)
- ML20135A359 + (ML20135A359)
- ML20135A360 + (ML20135A360)
- 05000275/LER-1985-024, :on 850712,temporary Change to safety-related Procedures Not Reviewed by Plant Staff Review Committee & Approved within 14 Day Tech Spec Time Limit.Caused by Change in Processing Procedure + (ML20135A362)
- IR 05000729/2008015 + (ML20135A364)
- ML20135A365 + (ML20135A365)
- ML20135A366 + (ML20135A366)
- ML20135A367 + (ML20135A367)
- JPN-97-006, Withdraws Request for NRC Approval of Changes Described in Ltr Re Feedwater Nozzle Insp Program + (ML20135A368)
- ML20135A369 + (ML20135A369)
- ML20135A371 + (ML20135A371)
- ML20135A372 + (ML20135A372)
- ML20135A373 + (ML20135A373)
- ML20135A374 + (ML20135A374)
- ML20135A375 + (ML20135A375)
- ML20135A376 + (ML20135A376)
- ML20135A378 + (ML20135A378)
- ML20135A379 + (ML20135A379)
- ML20135A380 + (ML20135A380)