Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133D428 + (ML20133D428)
- ML20133D430 + (ML20133D430)
- ML20133D432 + (ML20133D432)
- ML20133D434 + (ML20133D434)
- ML20133D436 + (ML20133D436)
- L-85-208, Responds to Violations Noted in Insp Repts 50-250/85-08 & 50-251/85-08.Corrective Actions:Operating Procedure OP 0204.2 Revised to Provide Explicit Instructions for Checking Charging Power Toggle Switch + (ML20133D439)
- ML20133D441 + (ML20133D441)
- ML20133D444 + (ML20133D444)
- ML20133D445 + (ML20133D445)
- IR 05000213/1985012 + (ML20133D446)
- ML20133D449 + (ML20133D449)
- ML20133D454 + (ML20133D454)
- ML20133D457 + (ML20133D457)
- ML20133D458 + (ML20133D458)
- ML20133D460 + (ML20133D460)
- ML20133D461 + (ML20133D461)
- B11741, Forwards Util Responses to NRC & Eg&G Idaho Comments at 850815 Exit Interview Re 850812-16 Audit of 10 Files Containing Environ Qualification Info for Equipment Located in Potentially Harsh Environs + (ML20133D464)
- ML20133D465 + (ML20133D465)
- ML20133D466 + (ML20133D466)
- ML20133D467 + (ML20133D467)
- ML20133D468 + (ML20133D468)
- ML20133D469 + (ML20133D469)
- ML20133D471 + (ML20133D471)
- ML20133D472 + (ML20133D472)
- ML20133D473 + (ML20133D473)
- ML20133D475 + (ML20133D475)
- 05000293/LER-1985-015, :on 850624,both Trains of Standby Gas Treatment Sys Started After Secondary Containment Isolation Received. Caused by Operator Error.Operations Personnel Instructed in Handling of Radiation Monitors + (ML20133D476)
- ML20133D477 + (ML20133D477)
- ML20133D479 + (ML20133D479)
- ML20133D480 + (ML20133D480)
- ML20133D481 + (ML20133D481)
- ML20133D482 + (ML20133D482)
- ML20133D483 + (ML20133D483)
- ML20133D484 + (ML20133D484)
- ML20133D485 + (ML20133D485)
- ML20133D486 + (ML20133D486)
- ML20133D487 + (ML20133D487)
- ML20133D489 + (ML20133D489)
- ML20133D491 + (ML20133D491)
- ML20133D493 + (ML20133D493)
- IA-85-553, Responds to FOIA Request for Meeting Minutes,Notes, Transcript & Handouts from CRGR 850724 Meeting Re Integral Simulation Test/Inservice Insp Pump & Valve Programs. Document 3 on App B Withheld (Ref FOIA Exemption 5) + (ML20133D493)
- ML20133D495 + (ML20133D495)
- ML20133D496 + (ML20133D496)
- AECM-85-0022, Responds to NRC Re Inadequate Response to Violations Noted in Insp Rept 50-416/84-48.Results of Review Did Not Identify Further Misuse of Matl Types, Confirming That Generic Condition Did Not Exist + (ML20133D498)
- ML20133D500 + (ML20133D500)
- ML20133D501 + (ML20133D501)
- PNO-III-85-065A, on 850729,containment Spray Pump 1B Failed to Start Due to Incorrect Overcurrent Setpoint.Caused by Personnel Error.Licensee Investigation Complete.Erroneous Setpoint Could Have Existed Since 1984 W/No Pump Failures + (ML20133D504)
- IR 05000925/2010009 + (ML20133D505)
- ML20133D506 + (ML20133D506)
- 05000341/LER-1985-056, :on 850826,determined That Leak Rate Test Not Performed After Maint on Div II Thermal Recombiner on 850620.Leak Test on 850829 Indicated Excessive Leakage. Caused by Damaged Gasket.Gasket Replaced + (ML20133D509)
- ML20133D510 + (ML20133D510)