Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132D787 + (ML20132D787)
- IR 05000424/1985024 + (ML20132D788)
- ML20132D789 + (ML20132D789)
- ML20132D792 + (ML20132D792)
- ML20132D793 + (ML20132D793)
- ML20132D795 + (ML20132D795)
- ML20132D797 + (ML20132D797)
- ML20132D801 + (ML20132D801)
- IR 05000348/1985026 + (ML20132D802)
- ML20132D806 + (ML20132D806)
- ML20132D808 + (ML20132D808)
- ML20132D809 + (ML20132D809)
- ML20132D811 + (ML20132D811)
- ML20132D813 + (ML20132D813)
- ML20132D815 + (ML20132D815)
- ML20132D816 + (ML20132D816)
- ML20132D817 + (ML20132D817)
- ST-HL-AE-1301, Revised Final Deficiency Rept Re Undetectable Failure That Could Exist in on-line Testing Circuits for Relays in Solid State Protection Sys.Initially Reported on 820804.Revised Corrective Action Re Wiring Change Discussed + (ML20132D818)
- IR 05000454/1996010 + (ML20132D819)
- ML20132D821 + (ML20132D821)
- ML20132D822 + (ML20132D822)
- 05000265/LER-1996-003, Forwards LER 96-003-00 Submitted IAW Requirements of 10CFR50.73(a)(2)(v)(D).Commitments Made by Ltr,Submitted + (ML20132D825)
- ML20132D826 + (ML20132D826)
- IR 05000293/1985023 + (ML20132D827)
- ML20132D828 + (ML20132D828)
- ML20132D830 + (ML20132D830)
- TXX-4497, Forwards Public Version of Emergency Plan Procedures, Including Rev 3 to EPP-115, Release of Emergency-Related Info to Public & Rev 2 to EPP-117, Post-Accident Sampling. W/Jm Felton 850708 Release Memo + (ML20132D831)
- ML20132D832 + (ML20132D832)
- IR 05000423/1985042 + (ML20132D833)
- NG-96-2597, Forwards Response to RAI Re thermo-lag Related Ampacity Derating Issues + (ML20132D834)
- 05000265/LER-1996-003-13, :on 961112,Unit 2 LPCI Was Declared Inoperable to 2D RHR Pump Discharge Check Valve Failure.Lpci Kf Was re-established within 1 Hour & Operability Determination Was Completed for PIF 96-3196 + (ML20132D837)
- ML20132D841 + (ML20132D841)
- ML20132D843 + (ML20132D843)
- PNO-III-96-075, on 961216,hosp Performed Radiation Surveys on Packages & Found Elevated Radiation Levels at Surface of Two Packages.Licensee Survey Showed Radiation Levels of 400 Mrem Per H at Surface of Package + (ML20132D845)
- PLA-2466, Monthly Operating Repts for Apr 1985 + (ML20132D846)
- ML20132D848 + (ML20132D848)
- ML20132D849 + (ML20132D849)
- ML20132D850 + (ML20132D850)
- NSD-NRC-94-4916, Forwards Outline of Plan to Address Uncertainty of Temp Profiles for Thermal Stratification & Methods to Be Used for Review + (ML20132D852)
- ML20132D853 + (ML20132D853)
- NSD-NRC-96-4874, Forwards Copies of Design Issues Tracking Repts for Human Factors Issues & Makeup of AP600 SSAR Chapter 18 to Reflect Resolution of Listed Dser Open Item Tracking Sys Items for NUREG-0711 Elements 2 & 4 + (ML20132D858)
- ML20132D862 + (ML20132D862)
- NSD-NRC-96-4913, Forwards W Responses to NRC RAI Re in-vessel Retention of Molten Core Debris & Response to NRC Request Made at 960624-26 W/Nrc AP600 PRA Meeting + (ML20132D863)
- ML20132D864 + (ML20132D864)
- ML20132D866 + (ML20132D866)
- ML20132D867 + (ML20132D867)
- IR 05000315/1985018 + (ML20132D869)
- PNO-IV-96-068, on 961217,reported Troxler Asphalt Content Gauge,Model 3241C,stolen from Trailer at San Xavier Rock & Matls in Tucson.Gauge Contains 100-mCi Am-241 Sealed Source. Lab & Computer Equipment Stolen Also + (ML20132D871)
- B15970, Provides NRC W/Info Required to Assess Util Proposed Selection of Contractor & Independent Verification Team for Conduct of Independent CA Verification Program for Plant Unit 3.NRC Approval of Proposed Contractor & Team Requested + (ML20132D874)
- ML20132D875 + (ML20132D875)
- ML20132D876 + (ML20132D876)