Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132C465 + (ML20132C465)
- ML20132C467 + (ML20132C467)
- ML20132C468 + (ML20132C468)
- ML20132C471 + (ML20132C471)
- ML20132C473 + (ML20132C473)
- ML20132C474 + (ML20132C474)
- ML20132C475 + (ML20132C475)
- ML20132C477 + (ML20132C477)
- LD-96-060, Forwards Rev to Sys 80+ Std Plant Design Control Document + (ML20132C478)
- ML20132C479 + (ML20132C479)
- ML20132C480 + (ML20132C480)
- ML20132C481 + (ML20132C481)
- ML20132C482 + (ML20132C482)
- ML20132C484 + (ML20132C484)
- ML20132C487 + (ML20132C487)
- ML20132C491 + (ML20132C491)
- ML20132C492 + (ML20132C492)
- ML20132C493 + (ML20132C493)
- ML20132C494 + (ML20132C494)
- IR 05000346/1984019 + (ML20132C496)
- ML20132C497 + (ML20132C497)
- ML20132C498 + (ML20132C498)
- ML20132C499 + (ML20132C499)
- ML20132C500 + (ML20132C500)
- 05000219/LER-1996-012, :on 961112,racked Out Breakers in 4160 Volt Ac Switchgear Did Not Meet Seismic Design Bases.Caused Because Previous Seismic Qualification Walkdowns Failed to Identify Problem.Tie Breakers Were Removed from Cubicle + (ML20132C502)
- ML20132C503 + (ML20132C503)
- ML20132C504 + (ML20132C504)
- ML20132C505 + (ML20132C505)
- PNO-V-85-062A, on 850919,reactor Trip Involving Inoperable Turbine Driven Auxiliary Feedwater Pump & Main Turbine Overspeed Occurred.Caused by Inadequate Lubrication of Bearing.Event Still Under Investigation + (ML20132C506)
- ML20132C507 + (ML20132C507)
- ML20132C508 + (ML20132C508)
- ML20132C509 + (ML20132C509)
- ML20132C510 + (ML20132C510)
- PNO-V-85-048, on 850724,licensee Determined That Plant Outage of Greater than 7 Days Expected to Repair Main Condenser. Caused by Damage to Two Condenser Tubes & Heater Drain Tank Inlet Shroud Due to Broken Condenser Baffle + (ML20132C511)
- ML20132C512 + (ML20132C512)
- ML20132C513 + (ML20132C513)
- ML20132C514 + (ML20132C514)
- ML20132C516 + (ML20132C516)
- IR 05000530/1985009 + (ML20132C517)
- ML20132C518 + (ML20132C518)
- ML20132C519 + (ML20132C519)
- ML20132C520 + (ML20132C520)
- ML20132C522 + (ML20132C522)
- ML20132C523 + (ML20132C523)
- ML20132C524 + (ML20132C524)
- ML20132C527 + (ML20132C527)
- ML20132C528 + (ML20132C528)
- ML20132C529 + (ML20132C529)
- ML20132C532 + (ML20132C532)
- RBG-21-585, Forwards Response to Generic Ltr 85-07, Implementation of Integrated Schedules for Plant Mods. Unlicensed Approach Warranted at Present Since Process for Developing Integrated Living Schedule Program in Developmental Phase + (ML20132C534)
- ML20132C535 + (ML20132C535)