Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132C086 + (ML20132C086)
- ML20132C087 + (ML20132C087)
- ML20132C088 + (ML20132C088)
- ML20132C089 + (ML20132C089)
- ML20132C093 + (ML20132C093)
- ML20132C095 + (ML20132C095)
- ML20132C097 + (ML20132C097)
- ML20132C099 + (ML20132C099)
- 05000395/LER-1985-023, :on 850823,plant Mode Change Made from Hot Shutdown to Hot Standby W/O Proper Alignment of RHR Sys. Caused by Personnel Error & Failure to Follow Procedures. Sys Returned to Proper Alignment + (ML20132C100)
- ML20132C101 + (ML20132C101)
- ML20132C102 + (ML20132C102)
- ML20132C103 + (ML20132C103)
- ML20132C104 + (ML20132C104)
- ML20132C105 + (ML20132C105)
- ML20132C106 + (ML20132C106)
- NG-96-2647, Monthly Operating Rept for Nov 1996 for Duane Arnold Energy Center + (ML20132C107)
- ML20132C109 + (ML20132C109)
- ML20132C111 + (ML20132C111)
- ML20132C112 + (ML20132C112)
- ML20132C113 + (ML20132C113)
- VPN-083-96, Forwards Description of Changes to Security Plan (Defueled Condition) & Replacement Pages.Encl Withheld + (ML20132C115)
- 05000302/LER-1985-014, :on 850816,two Actuations of Emergency Feedwater Initiation & Control Sys Occurred Due to Low Steam Generator Level.Caused by Temporary Imbalance Between Feed & Steam Flow Levels Due to Operator Error + (ML20132C116)
- ML20132C117 + (ML20132C117)
- HL-5283, Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 2 + (ML20132C118)
- ML20132C119 + (ML20132C119)
- ML20132C121 + (ML20132C121)
- IR 05000302/1985031 + (ML20132C125)
- ML20132C126 + (ML20132C126)
- PNO-III-96-073, on 961216,alert Declared by Licensee When Matl Release Sighted Coming from Feed Matls Bldg.Bad Pump Motor Connection on Scrubber Sys Caused Electrical Short, Tripped Breaker.Licensee Notified NRC Operations Ctr + (ML20132C127)
- ML20132C130 + (ML20132C130)
- ML20132C131 + (ML20132C131)
- 05000270/LER-1985-003-02, :on 850421,during Power Escalation After Zero Power Physics Testing,Control Rods Positioned Beyond Tech Spec Rod Position Index Limit Curve.Caused by Personnel Error.Boration of RCS Started + (ML20132C132)
- RBG-43557, Monthly Operating Rept for Nov 1996 for River Bend Station + (ML20132C133)
- 05000255/LER-1985-014, :on 850824,Tech Spec Required Boric Acid Injection Flow Paths Inadvertently Removed from Svc.Caused by Personnel Error.Personnel to Be Counseled on Requirements Re Component Operability + (ML20132C135)
- ML20132C136 + (ML20132C136)
- ML20132C137 + (ML20132C137)
- ML20132C138 + (ML20132C138)
- ML20132C141 + (ML20132C141)
- ML20132C142 + (ML20132C142)
- ML20132C145 + (ML20132C145)
- ML20132C146 + (ML20132C146)
- ML20132C147 + (ML20132C147)
- ML20132C149 + (ML20132C149)
- ML20132C151 + (ML20132C151)
- ML20132C152 + (ML20132C152)
- ML20132C153 + (ML20132C153)
- ML20132C154 + (ML20132C154)
- ML20132C155 + (ML20132C155)
- ML20132C157 + (ML20132C157)
- ML20132C158 + (ML20132C158)
- BSEP-96-0451, Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 2 + (ML20132C159)