Staff Requirements Memo Re 850917 Continuation of Commission 850724 Briefing in Washington,Dc on 850609 Event Involving Loss of All Feedwater.No Staff Requirements Issued Following Util Presentation
ML20132C152
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/24/1985
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To:
NRC OFFICE OF THE SECRETARY (SECY)
References
REF-10CFR9.7 NUDOCS 8509260454
Download: ML20132C152 (1)


Text

$Y o uco p

n'o, UNITED STATES j

NUCLEAR REGULATORY COMMISSION g

3g g

g C

W ASHINGTON, D.C. 20555 t

f September 24, 1985 OFFICE OF THE SECRETARY MENOBANDCM FOR THE RDJ0FD

/"

.(

ER]M:

Samuel J. Chilk, Secreta h

SUBJECT:

STAFF REQUIRDENTS - CONJINUATION OF 7/24 BRIEFING ON DAVIS-BESSE,10:30 A.M., TU23 DAY, SEPTDTER 17, 1985, COMISSIONERS' 00NFERENCE POCM, D.C. OFFICE (OPEN 'IO PCBLIC A'ITENDANCE)

'Ihe Ccmnission discussed with representatives of Toledo Edison the actions of the licensee following the event of June 9,1985 at the Davis-Besse plant which resulted in the loss of all feedwater.

'Ihe following representatives of Toledo Edison were in attendance at the mwting:

John P. Williamscn Chairrun Joe Williarrs, Jr.

Senior Vice President - Nuclear Steve Smith Assistant Plant Manager, Maintenance John Wood Mechanical / Structural Engineering Manager Ted Myers Nuclear Safety and Licensing Director Sushil Jain Senior Nuclear Engineer Jacque Lingenfelter Operations Engineering Manager 8509260454 050924 PDR 10CFR PT9.7 PDR

P f BillO' Conn 5rAssistant Plant Manager Operations Mel Stewart Training Director No staff requircnents were issued following the Toledo Edison presentation.

copies:

Chairran Palladino Ccmnissioner Foberts Ccmissioner Asselstine Cc m issioner Bernthal Ccmissioner Zech Ccmission Staff Offices EDO DCS - 016 Phillips PDR - Advance i

.