Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129C484 + (ML20129C484)
- ML20129C487 + (ML20129C487)
- ML20129C495 + (ML20129C495)
- ML20129C497 + (ML20129C497)
- ML20129C500 + (ML20129C500)
- ML20129C506 + (ML20129C506)
- 05000271/LER-1996-023, :on 960918,inadequate Surveillance Procedure Results in Failure to Meet TS Requirements.Caused by Inadequate Test Procedures.Rm Source Check Procedure Was Revised & Performed Satisfactorily + (ML20129C509)
- ML20129C511 + (ML20129C511)
- ML20129C516 + (ML20129C516)
- LIC-96-0157, Provides Change to Util Procedure OI-NI-2 W/Supporting 10CFR50.59 Evaluation Which Allowed Continued Operation W/Less than 75% But Greater than 28% Operable Incore Detector Strings + (ML20129C520)
- ML20129C521 + (ML20129C521)
- RBG-21681, Forwards Info Re HPCS Cooling Water Sys Keep Warm Function & Diesel Generator Air Start Sys Instrumentation & Control to Address Power Sys Branch SER Concerns & Revised Response to Question 430.86 + (ML20129C522)
- ML20129C526 + (ML20129C526)
- ML20129C527 + (ML20129C527)
- NSD-NRC-96-4848, Forwards Proprietary Info Re AP600 Fission Product Transport Calculations & Fission Product Source Rates,Application for Withholding Proprietary Info from Public Disclosure & Affidavit.See Also ANO 9809150241 + (ML20129C529)
- RBG-21-676, Submits Info Requested by Equipment Qualification Branch. Equipment W/Natural Frequencies Between 60Hz to 100Hz Qualified & Acceptable for Applicable Hydrodynamic Loads. Safety-related Pump & Valve Preoperational Tests Completed + (ML20129C531)
- ML20129C533 + (ML20129C533)
- ML20129C535 + (ML20129C535)
- ML20129C541 + (ML20129C541)
- ML20129C542 + (ML20129C542)
- ML20129C543 + (ML20129C543)
- RBG-21011, Revised Final Deficiency Rept DR-222 Re Voltage Drop in 125-volt Dc Cables Resulting in Improper Recharging Time of HPCS Battery.Procedure Initiated to Install Proper Size Cable + (ML20129C544)
- ML20129C547 + (ML20129C547)
- ML20129C548 + (ML20129C548)
- ML20129C549 + (ML20129C549)
- ML20129C551 + (ML20129C551)
- ML20129C552 + (ML20129C552)
- ML20129C554 + (ML20129C554)
- ML20129C557 + (ML20129C557)
- ML20129C558 + (ML20129C558)
- ML20129C559 + (ML20129C559)
- ML20129C560 + (ML20129C560)
- ML20129C563 + (ML20129C563)
- ML20129C565 + (ML20129C565)
- ML20129C567 + (ML20129C567)
- 05000352/LER-1985-059, :on 850616,ESF Actuation Occurred,Resulting in Isolation of Control Room Ventilation Sys.Caused by Broken Sample Tape in Control Room D Chlorine Detector.Tape Repaired.Isolation Reset + (ML20129C568)
- IR 05000344/1985019 + (ML20129C569)
- ML20129C570 + (ML20129C570)
- ML20129C572 + (ML20129C572)
- ML20129C573 + (ML20129C573)
- ML20129C575 + (ML20129C575)
- ML20129C576 + (ML20129C576)
- RBG-21-569, Forwards,For Review,Proposed Revs to Tech Spec 3/4.3.7.4 Re Remote Shutdown Monitoring Instrumentation & Controls. Changes Conform to Info Contained in FSAR + (ML20129C577)
- ML20129C579 + (ML20129C579)
- ML20129C580 + (ML20129C580)
- ML20129C584 + (ML20129C584)
- ML20129C586 + (ML20129C586)
- ML20129C587 + (ML20129C587)
- RBG-21460, Forwards Revs to FSAR Sections 13.3.7,13.4.1 & 13.4.2 Re Reviews & Approval Responsibilities for Emergency Plan & Implementing Procedures.Rev Supports Section 6 of Proposed Tech Specs & Will Be Incorporated in Future FSAR Amend + (ML20129C591)
- ML20129C594 + (ML20129C594)
- ML20129C595 + (ML20129C595)