ML20129C548
| ML20129C548 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 05/22/1985 |
| From: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Lee O PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20129C552 | List: |
| References | |
| NUDOCS 8506050576 | |
| Download: ML20129C548 (2) | |
See also: IR 05000267/1985011
Text
-.
-
..
MAY Z 21935
In Reply Refer To:
Docket:
50-267/85-11
L
Public Service Company of Colorado
ATTN:
0. R. Lee, Vice President
Electric Production
P. O. Box 840
Denver, Colorado 80201
Gentlemen:
This refers to the inspection conducted by Mr. H. D. Chaney of this office
during the period April 15-19, 1985, of activities authorized by NRC Operating
License DPR-34 for Fort St. Vrain Nuclear Generating Station, and to the
discussion of our findings with Mr. J. Gahm and other members of your staff at
the conclusion of the inspection.'
Areas examined during the inspection included the radioactive material
transportation program, implementation of the 10 CFR Part 61.55 and 61.56
requirements for low-level radioactive waste, onsite low-level radioactive
waste storage facilities, and routine radiation protection program activities.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the inspector.
These findings are documented in the enclosed.
inspection report.
During this inspection, it was found that certcin of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraphs 3 and 4 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
I
SP&ES
RPB1
TFWlerman
'
RIV:FRPS
FRPS
D:D
JHChaney/vls
BMurray
REjiall
RL
at
REIreland EHJohnson
y N)'/85
5 /Q /85 [ /{}/85 f/@/85
/
5 /n /85
$/)/85
r
t
,
J
85060
76 B50522
b
A
K 05000267
g
0
l
_
_ _ _ - _ _
- -
.
.Public Service Company _of Colorado
-2-
-Should you have any questions concerning this inspection, we will'be pleased to
discuss them with you.
-
Sincerely,
Ogn:1 Sir,ned BY
'
E. H.' Johnson
E. H. Johnson, Chief
Reactor Project Branch 1
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-267/85-11
cc w/ enclosures:
J. W. Gahm, Manager, Nuclear
Production Division
Fort St. Vrain Nuclear Station
'16805 WCR 19
Platteville, Colorado 80651
L. Singleton, Manager, Quality
Assurance Division
(same address)
Colorado Radiation Control Program Director
bec distrib. by RIV:
- RPB1
R.-P. Denise, DRSP
- Resident Inspector
R. D. Martin, RA
- Section Chief (RPB1/SPES)
E. Haycraft, LA
- P. Wagner, RPB1
J. Miller, ORB 3
- D.
Powers, RPB1
- D. Weiss, LFMB (AR-2015)
- EP&RPB
- D.
Chaney
- MIS System
R. Bangart
- RSTS Operator
- B. Murray
- RIV File
- w/766