Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- JSP-064-93, Application for Amend to License NPF-62,revising TS 6.9.1.7, Semiannual Radioactive Effluent Release Rept to Bring TS in Compliance W/Amended 10CFR50.36a Requirements Which Change Submittal Frequency of Rept to Annually + (ML20128K320)
- ML20128K321 + (ML20128K321)
- ML20128K322 + (ML20128K322)
- ML20128K323 + (ML20128K323)
- ML20128K325 + (ML20128K325)
- ML20128K328 + (ML20128K328)
- 1CAN078504, Forwards Change Notice 1 to Primary Reactor Containment Integrated Leak Rate Test,Final Rept. Errors Caused by Use of Different Computer Sys for Generation of Rept + (ML20128K330)
- ML20128K331 + (ML20128K331)
- ML20128K332 + (ML20128K332)
- ML20128K333 + (ML20128K333)
- ML20128K335 + (ML20128K335)
- ML20128K336 + (ML20128K336)
- ML20128K337 + (ML20128K337)
- ML20128K338 + (ML20128K338)
- 05000423/LER-1996-001-02, :on 960120,supplementary Leak Collection & Release Sys Declared Inoperable Due to Equipment Failure of Door Latch.Door Repaired & Plant Returned to 100% Power + (ML20128K341)
- ML20128K342 + (ML20128K342)
- ML20128K343 + (ML20128K343)
- ML20128K344 + (ML20128K344)
- 05000333/LER-1996-008-01, :on 960906,HPCI Sys Declared Inoperable Due to Failed DC to AC Power Inverter.Failed C11 Capacitor Located in HPCI Inverter 23INV-79 Replaced + (ML20128K345)
- ML20128K346 + (ML20128K346)
- ML20128K347 + (ML20128K347)
- ML20128K348 + (ML20128K348)
- ML20128K349 + (ML20128K349)
- IR 05000321/1985007 + (ML20128K350)
- ML20128K351 + (ML20128K351)
- ML20128K352 + (ML20128K352)
- ML20128K356 + (ML20128K356)
- ML20128K357 + (ML20128K357)
- IR 05000416/1985018 + (ML20128K360)
- JSP-065-93, Application for Amend to License NPF-62,revising TS 3/4.3.4.2, EOC Recirculation Pump Trip Sys Instrumentation to Revise Frequency for Measuring Breaker Arc Suppression Time + (ML20128K361)
- ML20128K363 + (ML20128K363)
- ML20128K364 + (ML20128K364)
- ML20128K365 + (ML20128K365)
- ML20128K366 + (ML20128K366)
- ML20128K367 + (ML20128K367)
- ML20128K368 + (ML20128K368)
- ML20128K369 + (ML20128K369)
- ML20128K370 + (ML20128K370)
- PNO-III-85-058A, on 850716,confirmatory Action Ltr Issued Documenting Util Commitment to Restrict Power Level to 5%, Pending Completion of Evaluation of 850702 Inadvertent Criticality Incident.Investigation Continuing + (ML20128K371)
- ML20128K373 + (ML20128K373)
- ML20128K375 + (ML20128K375)
- ML20128K376 + (ML20128K376)
- ML20128K377 + (ML20128K377)
- ML20128K380 + (ML20128K380)
- ML20128K381 + (ML20128K381)
- ML20128K382 + (ML20128K382)
- IR 05000426/2005024 + (ML20128K383)
- ML20128K384 + (ML20128K384)
- ML20128K386 + (ML20128K386)
- ML20128K388 + (ML20128K388)
- ML20128K389 + (ML20128K389)