Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128G098 + (ML20128G098)
- ML20128G099 + (ML20128G099)
- ML20128G100 + (ML20128G100)
- 05000254/LER-1985-007-08, :on 850531,fuel Pool Radiation Monitor 1A Failed Upscale,Tripping Reactor Bldg Ventilation & Starting Standby Gas Treatment Sys.Caused by Defective GE Sensor Converter,Model 194X927G16.Converter Replaced + (ML20128G103)
- ML20128G104 + (ML20128G104)
- ML20128G105 + (ML20128G105)
- ML20128G107 + (ML20128G107)
- ML20128G108 + (ML20128G108)
- ML20128G111 + (ML20128G111)
- ML20128G112 + (ML20128G112)
- ML20128G113 + (ML20128G113)
- ML20128G114 + (ML20128G114)
- ML20128G115 + (ML20128G115)
- ML20128G117 + (ML20128G117)
- ML20128G118 + (ML20128G118)
- L-96-503, Requests That Annual Fees for FY97 for SNM-1067 Be Assessed Per 10CFR171.16-1,Category 14 + (ML20128G119)
- ML20128G120 + (ML20128G120)
- 05000265/LER-1993-001-04, :on 930107,breaker for RSP Bus B Opened 2-203-2A MSIV Closed Causing Reactor Flux & Pressure to Exceed Scram Setpoints.Caused by Failure of Dc Solenoid Coil on MSIV Manifold Assembly.Ts Changed + (ML20128G121)
- IR 05000266/1996010 + (ML20128G122)
- 05000293/LER-1985-013, :on 850529,HPCI Sys Isolated During Steady Operation Due to False Steam Line High Flow Signal from Differential Pressure Indicating Switch.Caused by Setpoint Shift.Internal Switch Components Replaced + (ML20128G123)
- ML20128G124 + (ML20128G124)
- ML20128G125 + (ML20128G125)
- ML20128G126 + (ML20128G126)
- ML20128G127 + (ML20128G127)
- ML20128G129 + (ML20128G129)
- ML20128G130 + (ML20128G130)
- ML20128G131 + (ML20128G131)
- ML20128G134 + (ML20128G134)
- ML20128G135 + (ML20128G135)
- ML20128G136 + (ML20128G136)
- ML20128G138 + (ML20128G138)
- ML20128G140 + (ML20128G140)
- ML20128G141 + (ML20128G141)
- ML20128G142 + (ML20128G142)
- ML20128G143 + (ML20128G143)
- 05000388/LER-1985-017-01, :on 850530,drywell Sump Inleakage of About 10 Gpm Caused Reactor Shutdown.Shutdown Completed on 850531. Caused by Severe Packing Leak in Reactor Recirculation Pump Discharge Bypass Valve A.Valve Repaired + (ML20128G144)
- ML20128G145 + (ML20128G145)
- ML20128G146 + (ML20128G146)
- ML20128G147 + (ML20128G147)
- ML20128G148 + (ML20128G148)
- PY-CEI-NRR-0286, Notifies That Chapter 1 of FSAR Containing Changes Through Amend 19 & Rev 4 to Emergency Plan Forwarded to Atomic Energy Control Board (Aecb) of Canada,Per 850619 Request. Future Revs & Amends Will Be Forwarded as Available + (ML20128G149)
- ML20128G151 + (ML20128G151)
- ML20128G152 + (ML20128G152)
- ET-NRC-93-3814, Forwards Unpublished Paper Entitled, Experimental Evaluation of Flooding Between Hot Leg & SG Inlet Plenium of Pwr... & Videotape of 1/3 Scale Air Water Flooding Experiments.W/O Videotape.Paper Withheld + (ML20128G156)
- ML20128G157 + (ML20128G157)
- 05000387/LER-1985-022, :on 850528,loss of Zone I & Zone III Reactor Bldg Ventilation Occurred,Causing Automatic ESF Actuation. Caused by Communication Error Between Personnel Conducting 18-month Logic Sys Test.Personnel Counseled + (ML20128G159)
- PNO-V-85-039, on 850704,17 Gpm Leak Occurred Through RCS Drain Valves.Cause Not Reported.Leak Reduced by Increasing Torque on Valves.Torque within Manufacturer Requirements. Restart Activities Recommended After Valve Correction + (ML20128G161)
- ML20128G164 + (ML20128G164)
- ML20128G166 + (ML20128G166)
- ML20128G167 + (ML20128G167)
- PNO-III-85-054A, on 850702,newly Hired Mgt Employee Found Carrying Loaded .38 Calibr Handgun in Briefcase.Individual Suspended.Investigation Continuing + (ML20128G169)