ML20128G114
| ML20128G114 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 10/03/1996 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Link R WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20128G118 | List: |
| References | |
| NUDOCS 9610080337 | |
| Download: ML20128G114 (2) | |
See also: IR 05000266/1996010
Text
.-_
. _ _ . _ _ _ _
,
October 3, 1996
Mr. Robert Link
Vice President, Nuclear Power
,
Wisconsin Electric' Power Company
231 West Michigan Street - P379
i
Milwaukee, WI 53201
SUBJECT:
NRC INSPECTION REPORTS N0. 50-266/96010(DRS); 50-301/96010(DRS)
l
Dear Mr. Link:
This refers to.the inspection conducted by Mr. J. H. Neisler of this office on
August 16 and September 3-5, 1996, at the Point Beach Units 1 and 2 nuclear
pl ants. At the conclusion of the inspection, the inspection results were
j
discussed with those members of your staff identified in the enclosed report.
)
i
The inspection examined your activities relative to deficiencies identified by
your staff regarding physical separation of electrical wiring within the main
control boards. The areas examined included the operability determination,
circuit routing, short circuit analysis and planned corrective actions.
Activities in these areas appeared adequate; however, the determination that
separation of redundant circuits inside the control boards is a design basis
issue and not a licensing issue will require further review by the NRC.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and the enclosures will be placed in the NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Your cooperation with us is appreciated.
Sincerely,
original signed by B. Clayton /for
Geoffrey E. Grant, Director
Division of Peactor Safety
Docket No. 50-266
Docket No. 50-301
Enclosure:
Inspection Reports
No. 50-266/96010(DRS);
No. 50-301/96010(DRS)
See Attached Distribution
DOCUMENT NAME:
G:\\DRS\\P0196010.DRS
To receive a copy of this docurnent, indicate in the box:
"C" = Capy wnhout attachment / enclosure
"E" = Copy with attachment / enclosure
'N' = No copy
0FFICE
RIII ,
g RIII
,_
E RIII
/ RIII A &
E
NAME
JNei4Wribh
RGardner F V
MDapas /VJ1)
HClayEon/GGrant
DATE
10// /96
10/01/96
10/ f /96
10/3 /96
g
0FFICIAL RECORD COPY
\\
l
AOAA1&
I
/
I
[f ' p /
9610000337 961003
ADOCK 05000266
O
. .. _ . . _
. _ _ . _ . , _ _ . _
. . _ . . _ . . __.._
. _ _ ___. _ _ _ _ _ _ . _ . . _ _ _
__..
.
!
,
,
R. Link
-2-
October 3, 1996
cc w/ enc 1:
S. A. Patulski, Site General Manager
A. J. Cayia, Plant Manager
Virgil Kanable, Chief, Boiler Section
Cheryl L. Parrino, Chairman,
. Wisconsin Public Service Commission
State Liaison Officer
i
Distribution:
1
Docket File w/ enc 1
DRS w/ enc 1
A. B. Beach, RIII w/ enc 1
PUBLIC IE-01 w/ enc 1
RIII PRR w/ enc 1
Enf. Coordinator, RIII w/ enc 1
OC/LFDCB w/ enc 1
SRI, Pt. Beach w/ enc 1
CAA1 w/ encl (E-mail)
DRP w/ enc 1
LPM, NRR w/ enc 1
W. L. Axelson, RIII w/ enc 1
s
l
,
.
t
U
.
-
-
.
-.
.
.
,
. -.