JUN 07 E Docket No.: 50-412 Mr. John J. Carey Vice President, Nuclear Duquesne Light Company Robinson Plaza Building, No. 2, Suite 210 Pittsburgh, Pennsylvania 15202
Dear Mr. Carey:
SUBJECT:
USE OF ASME CODE CASE N-411 AND REGULATORY GUIDE 1.122 FOR THE BEAVER VALLEY UNIT 2 The staff has completed the review of your request for authorizations to use ASME Code Case N-411 alternate damping values for seismic analysis, and the amplified response spectra (ARSI peak spreading technique of Regulatory Guide 1.122 (RG 1.122) as part of the stress reconciliation program for selected cases of seismic Category I piping, as discussed in the DLC Letter 2 NRC-5-029, dated February 20, 1985.
Currently, DLC uses a technique of broadening the ARS peak resonant period values by plus 25 percent and minus 20 percent with the sides of the envelope vertical. When the ARS peak spreading technique of RG 1.122 is employed the peaks would be spread plus and minus 15 percent of the frequency of the peak and the sides of the resulting envelope would be parallel to those of the peak. The staff finds.this application of RG 1.122 acceptable.
Code Case N-411 " Alternate Damping Values for Seismic Analysis of Piping Section III Division 1 Class 1, 2 and 3 Construction" is a conditionally acceptable Code Case and is approved by the staff for specific plant applications pending revision of Regulatory Guide 1.61. Utilities wishing to use this Code Case shall submit in their request the following information or commitments:
(a) Commit to use the case for piping systems analyzed by response spectrum methods and not those using time-history analysis methods.
(b) Indicate if the case is to be used for new analyses or for reconciliation work and for support optimization.
(c) Due to the increased flexibility of the system commit to check all system predicted maximum displacements for adequate clearance with adjacent structures, component and equipment, and that the mounted equipment can withstand the increased motion.
8507090059 850607 ADOCK0500g PDR A
John J. Carey (d) When the alternate damping criteria of this code case are used, they will be used in their entirety in a given analysis and shall not be a mixture of Regulatory Guide 1,61 criteria and the alternate criteria of this Code Case.
The DLC has not fully complied with the commitments in the request of February 20, 1985. Pending full ccmpliance with the above commitments, the staff finds the DLC request to use Code Case N-411 to be acceptable for use at the Beaver Valley Power Station Unit No. 2 since DLC has stated that necessary changes will be implemented in a future Amendment to the FSAR.
The staff finds this commitment acceptable.
If you have any questions please contact the Project Manager, B. K. Singh, at (301) 492-8423.
Sincerely, 15 George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing cc: See next page s
DISTRIBUTION W 'M %
LB#3 Reading PDR Local PDR NSIC JLee BKSingh GWKnighton DL:LB#3 D
J 3
BKSingh G K r ghton 05/29/85 05/)e/85
[.b s
' 55V f
3 e
Beaver Valley Mr. John J. Carey Vice President, Nuclear Duquesne Light Company RobinsneflazaBuilding,No.2, Suite 110 PA Route 60 Pittsburgh / Pennsylvania 15205 Gerald Charnoff, Esq.
Mr. R. E. Martin, Manager Engineering Jay E. Silberg, Esq.
Beaver Valley Two Pro.iect Shaw, Pittnan, Potts & Trowbridge Duquesne Light Company 1800 M Street, N.W.
Robinson Plaza Buildina No. 2, Suite 110 Washington, DC 20036 PA Route 60 Pittsburgh, Pennsylvania 15205 Mr. C. W. Ewing, Quality Assurance Zori Ferkin Manager Assistant Counsel Quality Assurance Department Goveraor Energy Council Duquense Light Company 1625 N. Front Street
. P. O. Box 186 Harrisburg, PA 15105 Shippingport, Pennsylvania 15077 s
Mr. John J. Carey Vice President, Nuclear 6
Duquense Light Company Director, Pennsylvania Emergency
/p P. O. Box 4 Management Agency r
Shippingport, Pennsylvania 15077 Room B-151 Transportation & Safety Building Harrisburg, Pennsv1vania 17120 Mr. T. J. Lex Mr. Thomas Gerusky Westinghouse Electric Corporation 9ureau of Radiation Protection Power Systems PA Department of Environmental P. O. Box 355 Resources Pittsburgh, Pennsylvania 15230 P. O. Box 2063 Harrisburg, Pennsylvania 17120 Mr. P. RaySircar Stone & Webster Engineering Corporation BVPS-2 Records Management Supervisor P. O. Box 2325 Duquesne Light Company Boston, Massachusetts "02107 Post Office Box 4 Shippingport, Pennsylvania 15077 Mr. Glenn Walton U. S. NRC.
John A. Lee, Esq.
P. O. 181 Duquesne Light Company Shippingport, Pennsylvania 15077 1 0xford Centre 301 Grant Street Mr. Thomas E. Murley, Regional Admin.
Pittsburgh, Pennsylvania 15279 U. S. NRC, Region I 631 Park Avenue King of Prussia, Pennsylvanf,a 15229 k
j*
J 9
e
m--
.('
c e-
- o i Mr. E. F. Kurtz, Jr... Manager Regulatory Affairs
~ Beaver Valley Two Pro.iect Duquense Light Company
' Robinson Plaza Buidling No. 2 Suite #210 PA Route 60 Pittsburgh, Pennsylvania 15205