Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20127C646 + (ML20127C646)
- ML20127C648 + (ML20127C648)
- ML20127C649 + (ML20127C649)
- ML20127C651 + (ML20127C651)
- ML20127C652 + (ML20127C652)
- PNO-III-93-001, on 930107,licensee Reported That Patient Received Therapeutic Radiation Treatment to Wrong Portion of Vagina on 921209.Caused by Failure to Insert Dose in Correct Treatment Point.Further Patient Treatment Being Considered + (ML20127C653)
- ML20127C655 + (ML20127C655)
- IA-92-370, Final Response to FOIA Request for Documents Re Seismic Event Recorded on 830516 in Peoples Republic of China.No Records Located Subj to Request + (ML20127C655)
- ML20127C656 + (ML20127C656)
- ML20127C657 + (ML20127C657)
- ML20127C659 + (ML20127C659)
- ML20127C661 + (ML20127C661)
- ML20127C662 + (ML20127C662)
- ML20127C663 + (ML20127C663)
- ML20127C664 + (ML20127C664)
- ML20127C665 + (ML20127C665)
- ML20127C666 + (ML20127C666)
- ML20127C667 + (ML20127C667)
- ML20127C668 + (ML20127C668)
- ML20127C669 + (ML20127C669)
- ML20127C671 + (ML20127C671)
- B14227, Responds to NRC Re Violations Noted in Insp Rept 50-423/92-13 on 920503-0613.Corrective Actions:Breach Immediately Sealed Using Substitute Matl & Procedures for Erosion/Corrosion Investigation Changed + (ML20127C673)
- ML20127C674 + (ML20127C674)
- 05000324/LER-1992-004-03, :on 920730,RWCU Isolation Occurred During E7 Substation Deenergization of RWCU HX Outlet Temp Switch. Caused by Failure to Adequately Review Potential Effects of Activity.Procedures Revised + (ML20127C676)
- 05000361/LER-1992-012, :on 920731,automatic Reactor Trip Occurred When Potential Transformer Drawer Opened for Thermographic Insps, Resulting in Trip of Reactor Coolant Pumps.Caused by Inadequate Warning Sign.Guidelines Enhanced + (ML20127C678)
- ML20127C679 + (ML20127C679)
- ML20127C681 + (ML20127C681)
- ML20127C686 + (ML20127C686)
- ML20127C687 + (ML20127C687)
- ML20127C689 + (ML20127C689)
- ML20127C691 + (ML20127C691)
- ML20127C692 + (ML20127C692)
- ML20127C693 + (ML20127C693)
- 2CAN099202, Forwards Response to NRC 920618 Request for Addl Info Re Compliance W/Electrical Circuitry Isolation Requirements,As Followup to Edsfi,Per 920825 Telcon W/Nrc.Plans & Schedules for Resolution of Circuitry Isolation Issues Encl + (ML20127C694)
- ML20127C696 + (ML20127C696)
- 05000458/LER-1992-012, :on 920721,identified 18 Containment Isolation Valves Which Could Not Be Included in ILRT Program,Per 10CFR50,App J as Required by TS 3.6.4.Caused by Procedural Guidance.Valves Seat Leakage Tested + (ML20127C698)
- ML20127C702 + (ML20127C702)
- ML20127C703 + (ML20127C703)
- ML20127C704 + (ML20127C704)
- 3F0892-10, Semiannual Radioactive Effluent Release Rept for Jan-June 1992 + (ML20127C705)
- ML20127C706 + (ML20127C706)
- 05000344/LER-1992-022, :on 920803,discovered That Sp Performed Following 1985 Design Change Did Not Adequately Test Train a & B Auxiliary Relay Contacts of CCW Surge Tank.Caused by Personnel Error.Relay Replaced + (ML20127C707)
- ML20127C709 + (ML20127C709)
- 05000302/LER-1992-016, :on 920804,alert Declared When Fire Lasted for More than 10 Minutes Due to Failure in Alarm Circuit in Battery Charger.Caused by High Current.Failed Rectifier Replaced & Related Fuse Circuit Installed + (ML20127C710)
- ML20127C714 + (ML20127C714)
- ML20127C715 + (ML20127C715)
- PLA-2169, Forwards Updated Const Status Rept as of 840331.Info for Inclusion in NUREG-0030.Const Completed & Fuel Loading Commenced + (ML20127C719)
- 05000369/LER-1992-006, :on 920430,discovered Air in Nuclear Svc Water Assured Makeup Piping Associated W/Afw Pump Suction Header Rn Supply Isolations.Caused by Design Deficiency.Continuous Venting Initiated at High Point Locations + (ML20127C722)
- ML20127C723 + (ML20127C723)
- ML20127C724 + (ML20127C724)
- 05000370/LER-1992-009-03, :on 920805,reactor Trip Occurred Due to lo-lo Water Level in SG 2B.Caused by Equipment Failure.Vibration & Temp Data Collected for Nv Sys Letdown Orifice Piping & Parallel Path Solenoids Will Be Added + (ML20127C725)