Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20127B198 + (ML20127B198)
- ML20127B199 + (ML20127B199)
- ML20127B201 + (ML20127B201)
- ML20127B205 + (ML20127B205)
- ML20127B206 + (ML20127B206)
- IA-92-397, Final Response to FOIA Request for Documents.Forwards App a Document.Document Also Available in PDR + (ML20127B207)
- ML20127B207 + (ML20127B207)
- ML20127B208 + (ML20127B208)
- ML20127B210 + (ML20127B210)
- ML20127B213 + (ML20127B213)
- ML20127B215 + (ML20127B215)
- ML20127B216 + (ML20127B216)
- ML20127B217 + (ML20127B217)
- ML20127B226 + (ML20127B226)
- ML20127B228 + (ML20127B228)
- ML20127B231 + (ML20127B231)
- 05000369/LER-1992-011-02, :on 921210,four AFW Pressure Switches Found Outside Specified Setpoint Limit.Caused by Setpoint Drift Due to Unknown Factors.Switches Replaced & Mods Implemented to Increase Setpoint for All 20 Switches by Addl 2 Psig + (ML20127B232)
- ML20127B234 + (ML20127B234)
- ML20127B236 + (ML20127B236)
- ML20127B241 + (ML20127B241)
- ML20127B242 + (ML20127B242)
- ML20127B246 + (ML20127B246)
- ML20127B247 + (ML20127B247)
- ML20127B254 + (ML20127B254)
- 05000443/LER-1992-019-01, Forwards LER 92-019-01 Re Delta T/Tavg Protection Channel Operational Test,Documenting Root Cause & Corrective Actions,Per Evaluation Ongoing at Time of LER 92-019-00 Submittal + (ML20127B255)
- ML20127B257 + (ML20127B257)
- RBG-21214, Final Deficiency Rept DR-302 Re Wiring Configuration of HPCS Diesel Generator Supplied by Ge.Item Determined Not Reportable Under 10CFR50.55(e).Field Deviation Disposition Request LD1-3211 Issued + (ML20127B258)
- ML20127B262 + (ML20127B262)
- ML20127B263 + (ML20127B263)
- ML20127B264 + (ML20127B264)
- ML20127B265 + (ML20127B265)
- ML20127B266 + (ML20127B266)
- ML20127B267 + (ML20127B267)
- ML20127B268 + (ML20127B268)
- ML20127B269 + (ML20127B269)
- 05000443/LER-1992-019, :on 920916,determined That Procedures for Performing Delta T/Tavg Protection Channel Operational Test Inadequate Due to Lack of Complete Technical Review of I&C Procedures.Appropriate Procedures Revised + (ML20127B270)
- ML20127B277 + (ML20127B277)
- ML20127B281 + (ML20127B281)
- ML20127B282 + (ML20127B282)
- LIC-93-0004, Forwards Application for Amend to License DPR-40,revising TS Requirements for Containment Integrity & Personnel Air Lock to Reflect Provisions of C-E STS + (ML20127B284)
- ML20127B286 + (ML20127B286)
- JAFP-93-0007, Monthly Operating Rept for Dec 1992 for Ja FitzPatrick Nuclear Power Plant + (ML20127B293)
- ML20127B294 + (ML20127B294)
- ML20127B295 + (ML20127B295)
- ML20127B301 + (ML20127B301)
- ML20127B304 + (ML20127B304)
- IR 05000259/1985026 + (ML20127B307)
- ML20127B309 + (ML20127B309)
- W3P85-1410, Monthly Operating Rept for May 1985 + (ML20127B311)
- ML20127B312 + (ML20127B312)
- ML20127B314 + (ML20127B314)