Responds to 830315 Memo Requesting NRC Position on Capacity of Container Required by Section III.0 of App R to Hold Entire Lube Sys Inventory.One or More Tanks Necessary to Collect Total Lube Oil Inventory from Pumps
ML20127B236
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/16/1984
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Olshinski J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20127A989 List:
References
FOIA-85-306 LSO5-84-02-032, LSO5-84-2-32, NUDOCS 8402240252
Download: ML20127B236 (2)


Text

..

g

%~.h h* Hiot,4 a

~

NUCLEAR REGULATORY COMMISSION

(

(

79 g UNITED STATES C" 'T ~

' #g n

h.g

f WASHINGTON, D. C. 20555 c W.-;
  1. e

'%.N '...

.o February 16, 1984 LS05-84-02-032 MEMORANDUM FOR:

John A. Olshinski, Director Division of Engineering and Operational Programs, Region II FROM:

Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation

' ~ ~ ~

SUBJECT:

OIL COLLECTION SYSTEM REACTOR COOLANT PUMPS, FLORIDA POWER AND LIGHT COMPANY, ST. LUCIE UNIT 2, DOCKET NO. 50-389 l

Reference:

Memorandum to D. Eisenhut from J. 01shinski dated March 15, 1983 This memorandum is in response to the reference memorandum.that requested the NRC position on the capacity of the container required by Section III.0 of Appendix R to " hold the entire lube oil system inventory."

Section III.0 Oil Collection Systems for Reactor Coolant Pump is written for a single pump.

Therefore, the container is required to hold the entire inventory of the oil system of the pump.

Since additional pumps are present they would each be provided with a full collection capacity.

There are usually from 2 to 4 reactor coolant pumps in a plant.

Because the oil inventory of one large pump is approximately 275 gallons; some licensees have provided several containers connected in parallel for each pump.

The NRC staff position on the capacity of a reactor coolant pump oil collection system which meetsSection III.0 of Appendix R to 10 CFR 50 is as follows:

One or more tanks need to be provided with sufficient capacity to collect the total lube oil inventory from all reactor coolant pumps drained in the container.

Alternatives which have been found acceptable for exemption are:

1.

One or more tanks need to be provided with sufficient capacity to

- hold the total lube oil inventory of one reactor coolant pump with riarg(in if the tank (s) are located such that any overflow from thetank s not present an exposure fire hazard to or otherwise endanger safety related equipment; or 8402240252 840216 ')

A ADOCK05000389jNPt CF

~5 2pf-A

r l

(

.q.

\\

mr -

l l

John A. Olshinski, Director February ' 16, 1984 Where the RCP lube oil system is shown, by(analysis, to be capable of 2.

withstanding the safe shutdown earthquake SSE), eliminating the consideration of simultaneous lube oil system ruptures from a seismic event, protection is required for random leaks at mechanical joints in the lube oil system e.g., flanges, RTD connections, sight glasses.

l Alternative methods of protection may be deemed acceptable for such l

designs.

For RCP lube oil collection systems for such designs, one or more tanks need to be provided with sufficient capacity to hold the total lube oil inventory of one reactor coolant pump with margin.

..___-e

' ~ _.

Because protection is required only against possible leakage due to random leaks from one pump at a time, any overflow from the tank (s) need not be considered; or l

3.

For those pumps where the lube oil is contained entirely within the pump casing, an oil collection system may not be required, provided it can be shown that there are no potential significant leakage points.

gs'iE;d'OT en G. EiseM Darrefi' G. Eisenhut, Director l

Division of Licensing Office of Nuclear Reactor Regulation l'

cc:

T. Martin, Region I R. Spessard, Region III R..Denise, Region IV T. Bishop, Region V l

l DISTRIBUTION Central File ORB #5 FP File TWambach VBenaroya DCrutchfield i

l FMiraglia DEisenhut WJohnston RVollner f

h h,

}'

e DL: ORB #5 DE: ChEB DL

~

DL@

SA IR TWambach VBenarova DCrutchfield Fi' fa hat A/j/84 L/ 3 /8'4 6

7./ /84

/84 y {/84 j

'