MEMORANDUM FOR: Edward L. Jorda', Director
$ C Cc M S /))L n
Office for Analysis and Evaluation of Operational Data
[9- -
Af FROM:
Thomas E. Murley, Director
?
Office of Nuclear Reactor Regulation
% n / p,t/7p
SUBJECT:
STATUS REPORT ON THE DIAGNUSTIC EVALUATION PROGRAM
..e 4
44*
5 2m 9
As requested by your February 2,1990 memorandum, NRR has reviewed the
]
g o
draft subject report; our connents are provided in the enclosure.
c--
a Feedback was, m
cn i
provided by each of the NRR Project Managers whose facility was referenced in m
]
the report. The focus of our review was primarily verification of the infor-t mation provided in the Attachments to the status report.
).
Original signed by James H. Sniezek jj t
i W
Thomas E. Murley, Director f
Office of Nuclear Reactor Regulation
Enclosure:
As stated DISTRIBUTION Docket File J. Partlow (12G18)
J. Zwolinski G. Trammell T. Murley (12G18)
D. Mossburg, PMAS (Yellow Ticket 0909017)
T. Chan w/cy of J. Sniezek (12G18)
G. Holahan P. Shea incoming i
- See previous concurrence NRr PDR & LPDR, (w/cy of incoming) f s
/
b h
'G
- DR5P/FDV7y:DR5P/PDv"
- DR5P/AD/FDV":(AJAD/DR5P i
.... :... _ _. u.. :.... _ _..... _ :._ _....... _ _ : _ _... _ _....(jU/D B5P ;
4 NRR/ADPp DUNK I
.f......_ _ :...... _ _ _2' A:
.: 7__flahn a:..g AME :PShea \\'.'__._::TChan:sg
- CTrannell
- JZwolinski
- GHi
- JPartlow
- JSn k
j L. :..j.. _ _..
ATE :2/ A/90
- 2/13/90
- 2/13/90
- 2/;4'/90
- 2/g/90
- 2/d/90
- 2/ /90 (V,
~FC :D0 R
AME :T Ny ATE :2/! /90
+
1 CONTACT:
T. Chan, NRR o g n O j R g,y y. Q 492-3062
/
<\\M 10 022coe 70 3(
OFFICIAL RECORD C0 Y ha.... + ti..==.
VCSIALI T T P arrY Annn A1 *p
. _, ~
pa a.v o
UNITED STATES
!)
'g NUCLEAR REGULATORY COMMISSION l-',
-;j WASHINGTON, D. C. 20555 K,J i
+...
FEB 151990 MEMORANDUM FOR: Edward L. Jordan, Director Office for Analysis and Evaluation of Operational Data FROM:
Thomas E. Murley, Director Office of Nuclear Reactor Regulation
SUBJECT:
STATUS REPORT ON THE DIAGNOSTIC EVALUATION PROGRAM As requested by your February 2,1990 memorandum, NRR has reviewed the draft subject report; our comments are provided in the enclosure. Feedback was provided by each of the NRR Project Managers whose facility was referenced in the report. The focus of our review was primarily verification of the infor-l mation provided in the Attachments to the status report.
A
\\
, k lkl. '
Thonas E. Murleyv Di e tor Office of Nuclear Reactor Regulation
.)
Enclosure:
As stated i
f CONTACT:
T. Chan, NRR 492-3062
_ _ _ _ _. ~
__._m-J i
i MEMORANDUM FOR: Edward L. Jordan Director Office for Analysis and Evaluation of Operational Data FROM:
Thomas E. Purley, Director Office of Nuclear Reactor Regulation l
SUBJECT:
STATUS REPORT ON THE DIAGNOSTIC EVALUATION PROGP.AM 1
i i
As requested ',y your February 2,1990 memorandum, NRR has reviewed the j
draft subject report; our comments are provided herein. Feedback was provided by each td the NRR Project Managers whose facility was referenced in the report.
The focus of our review was primarily verification of the information provided
/
in the Attachments to the status report.
i 4
Thomas E. Murley, Director i
Office of Nuclear Reactor Regulation p
,/
/
/
' PDV :(AJAD/DR5P :D/DRSP
- NRR/ADP
- DONRR JFC :DR5P/PDV
- DRSP/P 4(jf;_:DR
/
1AME :PShea
- TCha.sg' anmell
- JZwolinski
- GHolahn
- JPartlow
- JSniezek JATE :2/ /90
- 2//3/90
- 2/g'J/90
- 2/ /90
- 2/ /90
- 2/ /90
- 2/ /90
/
/
IFC :DONRR
,___.:..... ____l.::............:..___.-____:.__.........::.... ______:-....--_....::...
iAME :TMurley /
} ATE :2/ /90 '
CONTACT:
T. Chan..NRR 492 3062 0FFICIAL RECORD COPY Document Name: YELLOW TICKET 0909017
-.__..~..
. ~
~ _ _. - -
-.~ -
Enclosure 1
"I NRR COMMENTS TO STATUS REPORT ON THE DIAGNOSTIC EVALUATION PROGRAM 1.
Page 2 of report, Table 1 - The report date for Brunswick should be
~1 August 1989.
2.
Page 3 of report, 2nd paragraph. Contrary to what is stated, Dresden was 4
in a period of organizational transition at the time of their evaluation.
3.
Page 5 of report, Table 3 - One additional root cause for performance problems may be added:
inadequate communication.
4.
Since Attachments 1 and 2 are illustrative examples of findings and responses, and are not verbatim statements from ins clarification that the findings and responses are "pection reports, selective and not complete" would be helpful.
I 4
j i
1
I
~ - -
p3 KfCu og UNITED STATES
.I.
_g NUCLEAR REGULATORY COMMISSION j
wAsHwcTow, p. c. 20sss l-l-
i 1
FROM:
ORIGINAL DUE DT: 02/16/90 TICKET NO: 0909017 DOC DT: 02/02/90 EDWARD L.
JORDAN, DIRECTOR NRR RCVD DATE: 02/06/90 i
-AEDD i
l l.
TO:
i l
FOR SIGNATURE OF:
- YEL MURLEY DESC:
ROUTING:
GTATUS REPORT ON THE DIAGNOSTIC EVALUATION PROGRAM-MURLEY/SNIEZEK PARTLOW ASSIGNED 10:
CONTACT:
MOSSBURG j.
DRSP HOLAHAN l
Please review the due date immediately l
If the due date does not allow adequate time to respond to this ticket, you may. request a revised due date.
The request must have-j prior approval from the. appropriate Associate Director or NRR
{
' Deputy Director and'must include a valid justi fication.
Contact
.NRR.mailroom with the new due dato (Doris Mossburg, x-23072).