Informs That Final Rept Re Evaluation of Containment Leak Rate Testing Criteria Cannot Be Delayed Beyond mid-Mar. Protracted Publication Period Reflects Negatively on ORNL Ability to Deliver Finished Product in Timely Manner
ML20127B286
Person / Time
Issue date: 02/21/1984
From: Arndt G
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To: Naus D
OAK RIDGE NATIONAL LABORATORY
Shared Package
ML20126E434 List:
References
FOIA-85-143 NUDOCS 8403060560
Download: ML20127B286 (2)


Text

- -_ .

FEB 21 tggprs viles subj ect nie na, as y l

l Mr. Dan Naus _

Building 9204-1  ;

'a.m.

Mail Stop 16 -

--I Oak Ridge National Laboratory I .2 .,:. _ 3, )

p.0. Box Y cter  ;

Oak Ridge. TN 37830 .1, neturn toexs, :,ua,:_ fue

Dear W . Naus:

l On October 4,1983. the first draft of the ORNL report. " Evaluation of )

Containment Laak Rate Testing Criteria." was sent to ma for review. This ,

uns reasonably close to the original target date for draft submittal of  !

September 1983. The forwarding letter noted that the draft would be sent l

/

to the publications office by October 10.

I understand from the monthly progress reports and from a followup call to you, that this draft is still not ready for issue. Although originally there was no urgency regarding the report's publication date, there is now.

due to this lengthy delay. At this point, delivery of the final report cannot be delgyed beyond mid-March at the latest. I need it to interface with our internal review of the Appendix 7 submittal to the ACRS.

The protracted publication period reflects negatively on ORNL's ability to '

deliver a finished product in a timely manner once the technical phase is complete. I hope that this can be corrected and final reports delivered efficiently.

DISTRIBUTION:

      • I' RES Alpha RES Reading Oreim 3.h b D E. G. Arndt RES Chron GArndt r Wt Mechanical / Structural Engineering Branch c ardson Division of Engineering Technology LShao ' Mfice of Nuclear Regulatory Nesearch l GArlotto cc: A. P. Malinauskas NO3Ohj360 21 I -

CF h FIL,E 329 s R

. 2//.7/84.. .2/17/84.. ..2/,lLl/84 vac roav us no-soi nacu ono OFFICIAL RECORD COPY

N A O

  1. % UNITED STATES g k NUCLEAR REGULATORY COMMisslON WASHINGTON, D. C. 20555 h .

k 8

%, . . . . . / FEB g3 Sil4 Mr. Dan Naus Building 9204-1 Mail Stop 16 Oak Ridge National Laboratory P.O. Box Y Oak Ridge. TN 37830

Dear  :

On October 4, 1983, the first draft of the ORNL report, " Evaluation of Containment Leak Rate Testing Criteria," was sent to me for review. This was reasonably close to the original target date for draft submittal of September 1983. The forwarding letter noted that the draft would be sent to the publications office by October 10.

I understand from the monthly progress reports and from a followup call to you, that this draft is still not ready for issue. Although originally there was no urgency regarding the report's publication date, there is now, due to this lengthy delay. At this point, delivery of the final report cannot be delayed beyond mid-March at the latest. I need it to interface with our internal review of the Appendix'7 submittal to the ACRS.

The protracted publication period reflects negatively on ORNL's ability to deliver a finished product in a timely manner once the technical phase is complete. I hope that this can be corrected and final reports delivered efficiently.

Sincerely, W

Gunter Arndt Mechanical / Structural Engineering Branch Division of Engineering Technology Office of Nuclear Regulatory Research cc: A. P. Malinauskas

- .~. ,