Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20126B586 + (ML20126B586)
- JSP-614-92, Application for Amend to License NPF-62,revising TS 3/4.3.2, Containment & Rv Isolation Control Sys, to Provide Reasonable Period of Time to Detect & Correct Inoperabilities of Differential Temp Isolation Instruments + (ML20126B587)
- ML20126B589 + (ML20126B589)
- ML20126B590 + (ML20126B590)
- ML20126B592 + (ML20126B592)
- ML20126B596 + (ML20126B596)
- ML20126B599 + (ML20126B599)
- ML20126B600 + (ML20126B600)
- ML20126B601 + (ML20126B601)
- ML20126B603 + (ML20126B603)
- ML20126B604 + (ML20126B604)
- ML20126B606 + (ML20126B606)
- ML20126B608 + (ML20126B608)
- ML20126B609 + (ML20126B609)
- ML20126B610 + (ML20126B610)
- ML20126B612 + (ML20126B612)
- ML20126B613 + (ML20126B613)
- PNO-III-85-047, on 850609,unit Tripped at 90% Power Due to Feedwater Pump Problems.Both Auxiliary & Main Feedwater Pumps Tripped,Leaving Steam Generators W/O Feedwater & at Low Water Level.Auxiliary Pumps Manually Restored + (ML20126B614)
- ML20126B616 + (ML20126B616)
- ML20126B617 + (ML20126B617)
- ML20126B618 + (ML20126B618)
- ML20126B620 + (ML20126B620)
- ML20126B623 + (ML20126B623)
- ML20126B625 + (ML20126B625)
- ML20126B627 + (ML20126B627)
- ML20126B629 + (ML20126B629)
- PNO-II-80-032C, updating PNO-II-80-032.Plant Remains in Stable Hot Standby.Repairs & Testing of Inoperable Decay Heat Closed Cycle Cooling Pump Expected to Be Completed Today.After Testing,Unit Will Be Shut Down + (ML20126B631)
- ML20126B632 + (ML20126B632)
- ML20126B633 + (ML20126B633)
- ML20126B634 + (ML20126B634)
- ML20126B635 + (ML20126B635)
- ML20126B636 + (ML20126B636)
- ML20126B637 + (ML20126B637)
- ML20126B639 + (ML20126B639)
- PNO-II-80-028, on 800219,criticality Warning Sys Experienced False Alarm.Fuel Mfg Bldg Evacuated.No Abnormal Radiation Levels Existed + (ML20126B644)
- ML20126B646 + (ML20126B646)
- ML20126B648 + (ML20126B648)
- ML20126B649 + (ML20126B649)
- ML20126B650 + (ML20126B650)
- ML20126B651 + (ML20126B651)
- ML20126B653 + (ML20126B653)
- U-600029, Forwards List of Selected Operating Events to Be Used in Sys Function & Task Analysis,Per 850424 Responses to NRC Comments on Dcrdr Program Plan.Plan Process Fulfills Suppl 1 to NUREG-0737 Requirements + (ML20126B654)
- ML20126B656 + (ML20126B656)
- ML20126B657 + (ML20126B657)
- ML20126B658 + (ML20126B658)
- ML20126B659 + (ML20126B659)
- ML20126B661 + (ML20126B661)
- U-600069, Forwards Emergency Plan Implementing Procedure EC-13, Reactor Core Damage Estimation. Procedure Revised to Include Third Core Damage Class,Referred to as Fuel Overheat Per TMI Item II.B.3 + (ML20126B662)
- ML20126B664 + (ML20126B664)
- PNO-II-80-032A, updating PNO-II-80-032.Reactor Conditions Have Stabilized & Dome Radiation Decreased to Zero. Containment Pressure Returned to Normal.Steam Generator Levels About 90% W/Natural Circulation in Progress + (ML20126B665)
- ML20126B667 + (ML20126B667)