Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20125E091 + (ML20125E091)
- 05000325/LER-1979-109, Forwards LER 79-109/03L-0 + (ML20125E092)
- 05000325/LER-1979-109-03, /03L-0:on 791229,during Normal Operation,Rod Drift Alarm Annunciated Intermittently for Rod 02-31.Rod 48 Indication Was Blinking.Probably Caused by Failure of Reed Switch for Indication + (ML20125E098)
- 05000325/LER-1980-001, Forwards LER 80-001/03L-0 + (ML20125E101)
- ML20125E103 + (ML20125E103)
- 05000325/LER-1980-001-03, /03L-0:on 800102,during Normal Operation, Containment Atmospheric Monitor Had Step Increase of Approx 2%.Caused by Instrument Drift.Instrument Recalibr & Returned to Svc + (ML20125E106)
- ML20125E107 + (ML20125E107)
- 05000324/LER-1980-002, Forwards LER 80-002/03L-0 + (ML20125E111)
- ML20125E112 + (ML20125E112)
- 05000324/LER-1980-002-03, /03L-0:on 800102,during Normal Reactor Startup,Rod Sequence Control Sys Would Not Allow Rods to Be Pulled Until Rod 34-27 Was Bypassed full-in. Caused by Defective full- in Reed Switch.Switch Will Be Repaired or Replaced + (ML20125E115)
- ML20125E116 + (ML20125E116)
- NUREG/CR-1215, Forwards Draft Copy of NUREG/CR-1215, Social & Economic Effects of Accident at Tmi,Findings to Date. Groups Rept Findings in Three Categories:Individual Behavior & Attitude Impacts,Effects on Regional Economy & Institutional Effects + (ML20125E119)
- ML20125E120 + (ML20125E120)
- ML20125E122 + (ML20125E122)
- 05000325/LER-1979-100, Forwards LER 79-100/03L-0 + (ML20125E123)
- 05000325/LER-1979-100-03, /03L-0:on 791228,while Performing Visual Insp of Inaccessible Snubbers,Two Standby Gas Treatment Sys Snubbers & One Discharge from Safety Relief Valve Snubber Were Found Inoperable.Caused by Extended Shafts & Valve Body Dama + (ML20125E127)
- ML20125E128 + (ML20125E128)
- HL-3069, Monthly Operating Repts for Nov 1992 for Edwin I Hatch Nuclear Plant,Units 1 & 2 + (ML20125E131)
- ML20125E135 + (ML20125E135)
- 3F1292-03, Monthly Operating Rept for Nov 1992 for Crystal River,Unit 3 + (ML20125E139)
- ML20125E140 + (ML20125E140)
- ML20125E144 + (ML20125E144)
- ML20125E154 + (ML20125E154)
- ML20125E156 + (ML20125E156)
- ML20125E157 + (ML20125E157)
- ML20125E167 + (ML20125E167)
- ML20125E171 + (ML20125E171)
- ML20125E175 + (ML20125E175)
- ML20125E176 + (ML20125E176)
- ML20125E177 + (ML20125E177)
- ML20125E179 + (ML20125E179)
- ML20125E182 + (ML20125E182)
- ML20125E184 + (ML20125E184)
- ML20125E186 + (ML20125E186)
- ML20125E187 + (ML20125E187)
- ML20125E188 + (ML20125E188)
- ML20125E191 + (ML20125E191)
- ML20125E193 + (ML20125E193)
- ML20125E196 + (ML20125E196)
- ML20125E197 + (ML20125E197)
- ML20125E198 + (ML20125E198)
- ML20125E199 + (ML20125E199)
- ML20125E200 + (ML20125E200)
- ML20125E202 + (ML20125E202)
- ML20125E203 + (ML20125E203)
- ML20125E204 + (ML20125E204)
- ML20125E206 + (ML20125E206)
- ML20125E208 + (ML20125E208)
- ML20125E210 + (ML20125E210)
- ML20125E212 + (ML20125E212)
- ML20125E214 + (ML20125E214)