ML20125E116
| ML20125E116 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 12/31/1991 |
| From: | NEBRASKA PUBLIC POWER DISTRICT |
| To: | |
| Shared Package | |
| ML20125E109 | List: |
| References | |
| NUDOCS 9212160190 | |
| Download: ML20125E116 (1) | |
Text
OPERATING DATA REPORT DOCKET NO.
_050-0298 UNIT-CNS DATE January 2. 1992 OPERATING STATUS TELEPHONE (402)-825-5766 1.
Unit Name:
COODer Nuclear Station Notes 2.
Reporting Period:
December 1991 3.
Ucensed Thermal Power (MWI):
2381 4.
Nameplate Rating (Gross MWe):
836 5.
Design Electrical Rating (Not MWe): 778 6.
Maximum Dependable Capacity (Gross MWe): 787 7.
Maximum Dependable Capacity (Not MWe):
764 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9 Power Level To Vrhich Restricted, If Any (Net MWe):
10 Reasons For Restriction,if Any:
This Month Yr..to-Date Cumulative 11, Hours in Reporting Period 744.0 8.760.0 153.433.0-12.
Number of Hours Reactor Was Critical 386 2 6.898 8 116.500.3 13.
Reactor Reserve Shutoown Hours 0.0 0.0 0.0 -
14.
Hours benerator On-Une 348.8 6.831.5 114.772.5 l
15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWH) 619.056.0 14.963.928.0 233.556.052.0 17.
Gross Electric Energy Generated (MWH) 202.574.0 4.960.742.0 75.570.152.0 18 Net Electric Energy Generated (MWH) 196.032.0 4.803.807.0 72.930.387.0 19.
Unit Service Factor 46.9 78.0 74.8 20.
Unit Availability Factor 46.9 78.0 74.8 l.
21.
Unit Capacity Factor ('Jsing MDC Net) -
34.5 71.8 62.2 22.
Unit Capacity Factor (Using DER Net) 33 9 70.5 61.1 23.
Unit Forced Outage Rate 0.0 0.0 4.5 24[
Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
j?
l^
25.
If Shut Down At End of Report Period, Estimated Date of Startup; N/A 26.
Units in Test Status (Prior to Commercial Operation):
Forecast
- Achieved INITML CRITICALITY INITIAL ELECTR: CITY COMMERCIAL OPEFMTION 9212160190 921204 PDR ADOCK 05000298 l
R PDR
-