Monthly Operating Rept for Nov 1992 for Millstone,Unit 1.W/
ML20125E140
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/30/1992
From: Newburgh G, Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MP-92-1296, NUDOCS 9212160208
Download: ML20125E140 (5)


Text

,

.g KCRTHEAST tmLmES cemera' of'>ce$ se'een street Baran connect'eut 3

Tne connectee ugnt Ana Powe comeany weste.n Massa:%setts E! ectr:c company P.O. BOX 270

(

Ne*ss St.7s*e N e $o HARTFORD. CONNECTIOUT 05141-0270 rany Ncrtemast Nucisar Ene gy company (2031665-5000 Re: 10CFR50.71(a)

December 11, 1992 MP-92-1296 U. S. Nuclear Reculatorv Commission Document Control Desk' Washington, D.C. 20555

Reference:

Facility Operating License DPR-21 Docket No. 50-245

Dear Sir:

In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for hiillstone Unit 1 is enclosed. One additional copy of the report is enclosed.

Very truly yours, NORTHEAST NUCLEAR ENERGY COh1PANY I

/

e, Ste en a

Vice President - Millstone Station SES/GSN:ljs

Enclosures:

(4) cc:

T. T. h!artin. Recional Administrator Recion I J. W. Andersen 'NRC Project hianager, Efillstone Unit No.1 P. D. Swetland, Senior Resident Inspector, hfillstone Unit Nos.1, 2, & 3 i

l l

l f

I *>s+

1U001n g

i

/

I 9212160208 921130 PDR ADOCK 05000245 i

R PDR l

l

AVERAGE DAILY UNIT POWER LEVEL 2

DOCKET NO. 50-245

~

UNIT Millstone 1-DATE 921206 CO3IPLETED BY G. Newburch i

TELEPHONE (203)447-1'791 4400 AIONTH: November 1992 i

AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (M We-Net)

DAY (MWe-Net) 1 647 17 648 2

646 18 644 3

647 19 648 a

4 452 20 648 5

641 21 648 4

6 646 22 647 7

647 23 647 l

8 647 24 647 9

589 25 636 10 646 26 648 11 646 27 648 12 646 28 648 13 635 29 647_.

i 14 647 30 648 15 647 31 N/A 16 648 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

1 OPERATING DATA REPORT i

DOCKET NO. 50-245 DATE 921206 CO31PLETED IW G. Newburgh TELEPHONE (203)447-1791 Ext..

OPERATING STATUS l

1.

Unit Name:

Millstone 1 Notes 2.

Reporting Period: November 1992 3.

Licensed Thermal Power (MWt): 2011 4.

Nameplate Rating (Gross MWe): 662 5.

Design Electrical Rating (Net MWe): 660 i

6.

Maximum Dependable Capacity (Gross MWe): 684 j

7.

Maximum Dependable Capacity (Net MWe): 654 4

S.

If Changes Occur in Capacity Ratings (Items 3 Through 7) Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe): N/A

10. Reasons For Restrictions, If Any: N/A j

This Month Yr-To-Date Cumulative

11. Hours in Reporting Period 720 3,040 192,912 4
12. Number Of Hours Reactor Was Critical 720 5,254.9 148,740.7
13. Reactor Reserve Shutdown Hours 0

0 3.283.3 i

14. Hours Generator On-Line 720 5,185.1 145,051.4
15. Unit Reserve Shutdown Hours 0

0 93.7 2

16. Gross Thermal Energy Generated (MWH) 1,426.869 9,954,294 272,469,681 1
17. Gross Electrical Energy Generated (MWH) 479,485 3,322,364 91,940,469 d

1S. Net Electrical Energy Generated (MWH) 458,999 3,161,086 87,703,047

19. Unit Service Factor 100 64.5 75.2
20. Unit Availability Factor 100 64.5 75.2
21. Unit Capacity Factor (Using MDC Net) 97.5 60.1 69.5
22. Unit Capacity Factoc (Using DER Net) 96.6 59.6-68.9 l
23. Unit Forced Outage Rate 0

35.5 12.5

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

[

25. If Shut Down at End of Report Period, Estimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved i

INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A i

l

UNrr SHUTDOWNS AND POWElt ItEDUCTIONS

' DOCKET NO. 50-245 UNIT NAME Millstone.1 DATE 921206 COMPLETED IlY G. Newburgh TELEPilONE (203)447-1791 4400 REPOltT MONTII: November 1992 Method of Licensee Cause & Corrective Duration Shutting Down Event System Component Action to Prevent No.

Date Type' (IIours) ': Reason Reactor Report #

Code Code Recurrence 2

3 d

5 92-07 921104 F

0 Il 5

N/A N/A N/A Power reduction to repair steam leak I

m IF: Forced 2 Reason:

3g,g aggg g _ g g

S: Scheduled A-Equipment Failure (Explc.in)

W anum Preparation of I)ata Entry Slicets for Il-Niaintenance or lest 2-mnud Sm Ucense Event Report (LER) File

~ ^ " ' " " ' " ' ' '""

~

'}

- R gti it ry Restriction ll2=r"* * ""'" """'"""""

7"U""f>"'"

'e= i - seme so"<<<

5-Power Reduction G-Operational Error (Explan)

Il-Other (Explain) 6-()tli r (lixpl in) r y

..m m.-

,,-..-3

4 J

i REFUELING INFORMATION REQUEST l

1.

Name of facility:

Millstone 1 2.

Scheduled date for next refueling shutdown: December 1993 4

3.

Scheduled date for restart following refueling: March 1994 i

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes, Technical Specification Changes Regarding:

l (1) Maximum Average Planar Linear Heat Generating Rate 3

(2) Maximum Critical Power Ratio l

j 5.

Scheduled date(s) for submitting licensing action and supporting information:

j Summer 1993 i

6, important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

j 18S GE10 Fuel Assemblies i

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage

~

pool:-

i (a) In the Core:

(a) 580 (b) 2116 (Unconsolidated)

The present licensed spent fuel pool storage capacity and the size of any increase 8.

in licensed storage capacity that-has been requested or is planned, in number of fuel assemblies:

Present capacity: Maximum 3229 fuel assembly locations l

l 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

l 1997, Spent Fuel Pool, Full Core Off Load Capability is Reached r

e 4

l l

t

-.-.