ML20125E140
| ML20125E140 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 11/30/1992 |
| From: | Newburgh G, Scace S NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| MP-92-1296, NUDOCS 9212160208 | |
| Download: ML20125E140 (5) | |
Text
,
.g KCRTHEAST tmLmES cemera' of'>ce$ se'een street Baran connect'eut 3
Tne connectee ugnt Ana Powe comeany weste.n Massa:%setts E! ectr:c company P.O. BOX 270
(
Ne*ss St.7s*e N e $o HARTFORD. CONNECTIOUT 05141-0270 rany Ncrtemast Nucisar Ene gy company (2031665-5000 Re: 10CFR50.71(a)
December 11, 1992 MP-92-1296 U. S. Nuclear Reculatorv Commission Document Control Desk' Washington, D.C. 20555
Reference:
Facility Operating License DPR-21 Docket No. 50-245
Dear Sir:
In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for hiillstone Unit 1 is enclosed. One additional copy of the report is enclosed.
Very truly yours, NORTHEAST NUCLEAR ENERGY COh1PANY I
/
e, Ste en a
Vice President - Millstone Station SES/GSN:ljs
Enclosures:
(4) cc:
T. T. h!artin. Recional Administrator Recion I J. W. Andersen 'NRC Project hianager, Efillstone Unit No.1 P. D. Swetland, Senior Resident Inspector, hfillstone Unit Nos.1, 2, & 3 i
l l
l f
I *>s+
1U001n g
i
/
I 9212160208 921130 PDR ADOCK 05000245 i
R PDR l
l
AVERAGE DAILY UNIT POWER LEVEL 2
DOCKET NO. 50-245
~
UNIT Millstone 1-DATE 921206 CO3IPLETED BY G. Newburch i
TELEPHONE (203)447-1'791 4400 AIONTH: November 1992 i
AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (M We-Net)
DAY (MWe-Net) 1 647 17 648 2
646 18 644 3
647 19 648 a
4 452 20 648 5
641 21 648 4
6 646 22 647 7
647 23 647 l
8 647 24 647 9
589 25 636 10 646 26 648 11 646 27 648 12 646 28 648 13 635 29 647_.
i 14 647 30 648 15 647 31 N/A 16 648 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
1 OPERATING DATA REPORT i
DOCKET NO. 50-245 DATE 921206 CO31PLETED IW G. Newburgh TELEPHONE (203)447-1791 Ext..
OPERATING STATUS l
1.
Unit Name:
Millstone 1 Notes 2.
Reporting Period: November 1992 3.
Licensed Thermal Power (MWt): 2011 4.
Nameplate Rating (Gross MWe): 662 5.
Design Electrical Rating (Net MWe): 660 i
6.
Maximum Dependable Capacity (Gross MWe): 684 j
7.
Maximum Dependable Capacity (Net MWe): 654 4
S.
If Changes Occur in Capacity Ratings (Items 3 Through 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions, If Any: N/A j
This Month Yr-To-Date Cumulative
- 11. Hours in Reporting Period 720 3,040 192,912 4
- 12. Number Of Hours Reactor Was Critical 720 5,254.9 148,740.7
- 13. Reactor Reserve Shutdown Hours 0
0 3.283.3 i
- 14. Hours Generator On-Line 720 5,185.1 145,051.4
- 15. Unit Reserve Shutdown Hours 0
0 93.7 2
- 16. Gross Thermal Energy Generated (MWH) 1,426.869 9,954,294 272,469,681 1
- 17. Gross Electrical Energy Generated (MWH) 479,485 3,322,364 91,940,469 d
1S. Net Electrical Energy Generated (MWH) 458,999 3,161,086 87,703,047
- 19. Unit Service Factor 100 64.5 75.2
- 20. Unit Availability Factor 100 64.5 75.2
- 21. Unit Capacity Factor (Using MDC Net) 97.5 60.1 69.5
- 22. Unit Capacity Factoc (Using DER Net) 96.6 59.6-68.9 l
- 23. Unit Forced Outage Rate 0
35.5 12.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
[
- 25. If Shut Down at End of Report Period, Estimated Date of Startup: N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved i
INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A i
l
UNrr SHUTDOWNS AND POWElt ItEDUCTIONS
' DOCKET NO. 50-245 UNIT NAME Millstone.1 DATE 921206 COMPLETED IlY G. Newburgh TELEPilONE (203)447-1791 4400 REPOltT MONTII: November 1992 Method of Licensee Cause & Corrective Duration Shutting Down Event System Component Action to Prevent No.
Date Type' (IIours) ': Reason Reactor Report #
Code Code Recurrence 2
3 d
5 92-07 921104 F
0 Il 5
N/A N/A N/A Power reduction to repair steam leak I
m IF: Forced 2 Reason:
3g,g aggg g _ g g
S: Scheduled A-Equipment Failure (Explc.in)
W anum Preparation of I)ata Entry Slicets for Il-Niaintenance or lest 2-mnud Sm Ucense Event Report (LER) File
~ ^ " ' " " ' " ' ' '""
~
'}
- R gti it ry Restriction ll2=r"* * ""'" """'"""""
7"U""f>"'"
'e= i - seme so"<<<
5-Power Reduction G-Operational Error (Explan)
Il-Other (Explain) 6-()tli r (lixpl in) r y
..m m.-
,,-..-3
4 J
i REFUELING INFORMATION REQUEST l
1.
Name of facility:
Millstone 1 2.
Scheduled date for next refueling shutdown: December 1993 4
3.
Scheduled date for restart following refueling: March 1994 i
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes, Technical Specification Changes Regarding:
l (1) Maximum Average Planar Linear Heat Generating Rate 3
(2) Maximum Critical Power Ratio l
j 5.
Scheduled date(s) for submitting licensing action and supporting information:
j Summer 1993 i
6, important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
j 18S GE10 Fuel Assemblies i
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage
~
pool:-
i (a) In the Core:
(a) 580 (b) 2116 (Unconsolidated)
The present licensed spent fuel pool storage capacity and the size of any increase 8.
in licensed storage capacity that-has been requested or is planned, in number of fuel assemblies:
Present capacity: Maximum 3229 fuel assembly locations l
l 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
l 1997, Spent Fuel Pool, Full Core Off Load Capability is Reached r
e 4
l l
t
-.-.