Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ST-HL-AE-5367, Provides Supporting Info Re Operations QA Plan Change QA-026 + (ML20117D708)
- ML20117D709 + (ML20117D709)
- ML20117D712 + (ML20117D712)
- 05000424/LER-1996-003-01, :on 960425,determined That Accumulator Crosstie Could Have Prevented Fulfillment of Safety Function of Sys Needed to Mitigate Consequences of Accident.Caused by Inadequate Procedures.Procedures Changed + (ML20117D718)
- NG-96-1033, Forwards 1995 Annual Financial Repts for Owners of Duane Arnold Energy Ctr,Including Ies Utils,Inc,Corn Belt Power Cooperative & Central IA Power Cooperative + (ML20117D719)
- ML20117D724 + (ML20117D724)
- ML20117D729 + (ML20117D729)
- ML20117D734 + (ML20117D734)
- ML20117D744 + (ML20117D744)
- ML20117D745 + (ML20117D745)
- ML20117D750 + (ML20117D750)
- BVY-96-057, Monthly Operating Rept for Apr 1996 for VT Yankee Power Station + (ML20117D759)
- ML20117D763 + (ML20117D763)
- ML20117D770 + (ML20117D770)
- ML20117D780 + (ML20117D780)
- 05000331/LER-1996-002-01, :on 960408,PCIS Half Group III Isolation Occurred Due to Blown Fuse During Maint.Fuse Was Replaced & Radiation Monitor Was Tested + (ML20117D784)
- ML20117D787 + (ML20117D787)
- ML20117D788 + (ML20117D788)
- 05000423/LER-1996-007-01, :on 960403,CRS & Qs Sys Found Outside Design Basis Due to Design Errors.Restored Sys to Appropriate Design Basis Requirements Prior to Declaring Sys Inoperable + (ML20117D790)
- ML20117D794 + (ML20117D794)
- ML20117D799 + (ML20117D799)
- ML20117D802 + (ML20117D802)
- ML20117D806 + (ML20117D806)
- ML20117D821 + (ML20117D821)
- 05000321/LER-1996-005, :on 960414,supply Breaker for 4160V/600V Station Svc Transformer 1D Opened de-energizing 600V Bus 1R23-S004.Caused by Personnel Error.Personnel Involved Counseled + (ML20117D825)
- 05000219/LER-1996-003, :on 960409,determined Certain 4160 Vac Emergency Electrical Bus Grid Undervoltage Relay Contacts Not Functionally Tested Required by TS Table 4.1-1,Items 28 a & B.Caused by Inadequate Testing + (ML20117D840)
- 05000263/LER-1996-003, Forwards LER 96-003-00 Re re-analysis of High Energy Line Break,Error Found in Existing Analysis.Rept Contains Submitted New NRC Commitments + (ML20117D841)
- 05000263/LER-1996-003-01, :on 960404,personnel Identified Error in Current Licensing Basis Analysis.Caused by Improper Analyzed Ambient Temps in Vicinity.Mods Will Be Installed During Current Outage + (ML20117D846)
- 05000322/LER-1985-013, :on 850407,failure of HPCI Circuit Inverter Rendered HPCI Sys Inoperable.Caused by Failure of Cooling Fan Causing Inverter Cabinet & Circuitry to Overheat. Procedures for Fan Insp Will Be Revised + (ML20117D848)
- ML20117D851 + (ML20117D851)
- ML20117D864 + (ML20117D864)
- ML20117D876 + (ML20117D876)
- ML20117D877 + (ML20117D877)
- 2CAN038505, Provides Justification That Senior Reactor Operators Adequately Trained to Cope W/Emergency Situations.Scope of Training for Future Senior Reactor Operator Candidates Will Place More Emphasis on Emergency Plan Training + (ML20117D878)
- JAFP-96-0200, Responds to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment, + (ML20117D880)
- ML20117D886 + (ML20117D886)
- ML20117D891 + (ML20117D891)
- ML20117D912 + (ML20117D912)
- ML20117D919 + (ML20117D919)
- NRC-96-0048, Requests NRC Review & Approval of Proposed QA Program Change for Audit Program,Deleting Frequencies from Audits Specified by Regulations & Deleting Requirement to Perform Annual Audit of Fitness for Duty Lab + (ML20117D931)
- ML20117D953 + (ML20117D953)
- 05000373/LER-1985-036-01, :on 850403,RHR Inboard Shutdown Cooling Suction Isolation Valve 1E12-F009 Isolated.Caused by Spurious Pressure Spike.Pressure Snubbers Installed & Upgrades for Environ Qualification Reviewed + (ML20117D959)
- ML20117D968 + (ML20117D968)
- DCL-96-102, Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld + (ML20117D970)
- ML20117D971 + (ML20117D971)
- ML20117D974 + (ML20117D974)
- ML20117D993 + (ML20117D993)
- ML20117D996 + (ML20117D996)
- ML20117D997 + (ML20117D997)
- ML20117E004 + (ML20117E004)
- RBG-20753, Responds to NRC Re Violations Noted in Insp Rept 50-458/85-02.Corrective Actions:Ansi & ASME Codes Reviewed for Spare Parts Storage Requirements & MSP-0002 Revised to Clarify Methods Used to Meet Requirements + (ML20117E009)