7 Georgia "1 verr Comp:ny

,g - Ficuu 2. ror 299A 1 , ,,Waynstb. o. Georgia 30830 -

4 -3' Telephort . 404 554 9961 404 724-8114 Southenn Arroany Services,Inc.

Post OffLd:Bcv2625 Birmingham, Aabama 35202 Telephone 205 870-6011 Vogtle Proj.ect May 7, 1985 Director of Nuclear Reactor Regulation File: 'X7BC35 Attention: Ms.' Elinor G. Adensam, Chief Log: GN-600 Licensing Branch f4

-Division.of Licensing _

U. S. Nuclear Regulatory Commission

~ Washington, D.C. 20555 REF: - BAILEY TO DENTON, GN-579, DATED 4/15/85 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTIE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 DSER OPEN ITEM 2 l

Dear Mr. Denton:

On May 2, 1985, your staff conducted a meteorological site visit. ~ During the visit your staff indicated that the report transmitted as Enclosure A of the referenced letter indicated some anomalies in the delta temperature-readings.- A review of the meteorological tower records-indicates that in April 1984 the delta temperature to be high from .75 to 20F from the bottom to the top of the scale. This in turn resulted in the anomalous data. The previous calibration in November 1983 showed no problems with the delta temperatures. A thorough review of all the calibration. records revealed no problems that would have affected the data used for the licensing of the VEGP as presented'in Section 2.3 of the FSAR.

-As indicated to your staff, we will advise you by mid June-if the first full year of the new tower data will be available for submittal. This will.be based upon.a data _ recovery rate of 90% or greater for a composite wind speed'and direction 10m and delta temperature 60-10m. A comparison will be made between the new tower data with the four years used as the l licensing basis to'further validate the licensing base data.

h 8505100280 850507 PDR I J ' ip E

ADOCK 05000424- ' i PDR \

l

W

_ [ J .

Director of Nuclear Reactor Regulation File: X7BC35 May 7, 1985 Log: GN-600 Page 2 If your staff requires any additional information, please do not hesitate to contact me.

Sincerely,

. [( . i J. A. Bailey Project Licensing Manager JAB /sm xc: D. 0. Foster R. A. Thomas J. E. Joiner, Esquire B. W. Churchill', Esquire M. A. Miller B. Jones, Esquire L. T. Gucwa G. Bockhold, Jr.

T. Johnson D. C. Teper L. Fowler Vogtle Project File 0205m I

Y r -

.-- , , . - , - - * , , e r ,y -