Monthly Operating Rept for Apr 1996 for Wolf Creek Generating Station
ML20117D770
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/30/1996
From: Maynard O
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
WO-96-0082, WO-96-82, NUDOCS 9605140261
Download: ML20117D770 (7)


Text

. . . .. - -, -. . . . . - -. .. . . .

W@) LF NUCLEAR CREEKOPERATING 4

May 9, 1996 WO 96-0082 U. S. Nuclear Regulatory Commission ATTN; Document Control Desk Mail Station P1-137 Washington, D. C. 20555

Subject:

Docket No. 50-482: April, 1996, Monthly Operating Report Gentlemen Attached is the April, 1996, Monthly Operating Report for Wolf Creek Generating Station. This submittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.

Very truly yours, j Otto L. Maynard OLM/jad Attachment cc: L. J. Callan (NRC) , w/a W. D. Johnson (NRC) , w/a J. F. Ringwald (NRC) , w/a J. C. Stone (NRC), w/a 140053 9605140261 960430 PDR ADOCK 05000482 R pop P.O. Box 411/ Burhngton, KS 66839 / Phone: (316) 364-8831 i An Equal Opportunity Ernpioyer M F HCNET

{

Attachment to WO 96-0082 _

page 1 of 6 1

l l

WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION MONTHLY OPERATING REPORT MONTH: April YEAR: 1996 Docket No.: 50-482 l

Facility Operating License No.: NPF-42 -

Report No. 134 l

f-L l

!^

i i

e i

i

_-.m.. _ . _ _ _ _ _ . - . _ . - - _ _ _ . . . _ . .._. - __ . _ . . ... _.-. _ _ . - _ _ _

Attachment to WO 96-0082

SUMMARY

l l

l l

Tha following report highlights the operating experience of Wolf Creek Generating Station for the month of April, 1996. This report is being provided pursuant to Technical Specification 6.9.1.8. j I.

SUMMARY

OF OPERATING EXPERIENCE The unit began the month of April, 1996, in Mode 4. The unit was in process of start-up following Refuel VIII. The unit entered Mode 3 at 2312, April 2, 1996; Mode 2 at 2315 on April 5, 1996; and Mode 1 at 0550 April 7, 1996. The plant reached Mode 1, 100%

powar at 0430, April 11, -1996. The unit operated at approximately 100% power until commencing turbine / generator load decrease at 2106, April 19, 1996; at 0950 April 20, 1996, the unit was in Mode 2, approximately 5% power, to balance the turbine. Upon completion of turbine balancing work, the unit commenced increasing power. The unit rasntered Mode 1 at 1458, and the generator was synchronized to the grid at 2145, April 20, 1996. The unit reached Mode 1, 100% power, at 0000, April 22, 1996, and remained at that level through the end of April, 1996.

l II. MAJOR SAFETY RELATED MAINTENANCE ACTIVITIES NONE i

I i Wolf Creek Generating Station Monthly Operating Report i April, 1996 Page 2 of 6

- __ .. . - . _ .. . .. . .-. . .- - _. ~ . - - . - - ___ ._ -

A'ttachmGnt to WO 96-0082 OPERATING DATA REPORT DOCKET NO. 50-492 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 5-8-96 TELEPHONE 316-364-8931

. OPERATING STATUS

1. Reporting Period: April, 1996 Gross Hours in Reporting Period: 719
2. Currently Authorized Power Level (MWt) : 3565 Max. Depend. Capacity (MWe- 1167 Net) :

Design Electrical Rating (MWe-Net): 1170

3. Power Level to Which Restricted (If Any) (MWe-Net) : N/A
4. Reasons for Restriction (If Any) : N/A This Month Yr. to Date Cumulative
5. Number of Hours Reactor was Critical 594.9 1,294.5 75,911.2 j l
6. Reactor Reserve Shutdown Hours 0.0 0.0 339.8 l
7. Hours Generator on Line 548.7 1,248.3 75,028.0 l
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWh) 1,784,195 4,265,894 249,607,565 t-
10. Gross Electrical Energy Generated (MWh) 615,248.0 1,478,444 86,737,364
11. Net Electrical Energy Generated (MWh) 581,521.0 1,380,875 82,817,726
12. Reactor Service Factor 82.7% 44.6% 81.2%

i lL 3 . Reactor Availability Factor 82.7% 44.6% 81.6% l

14. Unit Service Factor 76.3% 43.0% 80.3%-

j 15. Unit Availability Factor 76.3% 43.0% 80.3%

l 16. Unit Capacity Factor (Using MDC) 69.3% 40.8% 77.9%

17. Unit Capacity Factor (Using Design MWe) 69.1% 40.7% 75.8%
18. Unit Forced Outage Rate 0.0% 8.1% 4.8%
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each) :

None

20. If Shut Down at End of Report Period, Estimate Date of Startup: N/A Wolf Creek Generating Station 4 Monthly Operating Report April, 1996 Page 3 of 6

A'ttachment to WO 96-0082 l

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-482 j WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION l DATE 5-B-96 ,

TELEPHONE 316-364-es31 l I

MONTH April, 1996 j DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 1184 2 0 18 1182 3 0 19 1165 4 0 20 61 5 O. 21 879 6 0 22 1179 7 4- 23- 1180  !

l 8 430 24 1182 l 9 793 25 1180 10 1102 26 1180 11 '1177 27 1173 12 1173 28 1181 13 1183 29 1181 14 1183 30 1181 -

15 1183 31 N/A 16 1182 i

Wolf Creek Generating Station j Monthly Operating Report April, 1996 Page 4 of 6 l

t

Attachment to WO 96-0082 .

UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 2-5-96 TELEPHONE 316-364-8831 Type METHOD OF SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / COMMENTS No Date S: SCHEDULED (Hours) (1) OR REDUCING POWER (2) 1 4/1/96 S 155.2 C 4 The unit remained in outage conditions for Refuel VIII, and resumed operation on April 7, 1996.

2 4/19/96 S 51 B 5 Power was reduced to 5%, Mode 2, 4/19/96, for turbine balancing.

SUMMARY

The unit began the month of April, 1996, in Mode 4. The unit was in process of start-up following Refuel VIII. The unit entered Mode 3 at 2312, April 2, 1996; Mode 2 at 2315 on April 5, 1996; and Mode 1 at 0550 April 7, 1996. The plant reached Mode 1, 100% power at 0430, April 11, 1996. The unit operated at approximately 100% power until commencing turbine / generator load decrease at 2106, April 19, 1996; at 0950 April 20, 1996, tha unit was in Mode 2, approximately 5% power, to balance the turbine. Upon completion of turbine balancing work, the unit commenced increasing power. The unit reentered Mode 1 at 1458, and the generator was synchronized to the grid at 2145, April 20, 1996. The unit reached Mode 1, 100%

power, at 0000, April 22, 1996, and remained at that level through the end of April, 1996.

1) REASON: A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD: 1. MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2. MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3. AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4. CONTINUED
5. REDUCED LOAD
9. OTHER Wolf Creek Generating Station Monthly Operating Report April, 1996 Page 5 of 6

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ =

. . .. . . . _ , ~ . - . . . - . . - ~ . . ... . . . . . - .. . .. - . . . . . - - - - . . _ .

s

',.A'ttachmant to WO 96-0002 WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION UNIT NO. 1 MONTH April, 1996

SUMMARY

OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reduction or resulted in significant non-load related incidents.

l DATE IIME EVENT 4/1/96 0000 The unit remained in outage conditions for Refuel VIII, and resumed operation on April 7, 1996.

4/19/96 2106 Power was reduced to 5%, Mode 2, 4/19/96, for turbine balancing.

1 i

l l

I l

I f

~

Wolf Creek Generating Station Monthly Operating Report April, 1996 Page 6 of 6 l-