Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20116K894 + (ML20116K894)
- ML20116K899 + (ML20116K899)
- ML20116K926 + (ML20116K926)
- ML20116K939 + (ML20116K939)
- ST-HL-AE-4254, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-498/92-26 & 50-499/92-26 on 921016.Corrective Actions: Plant Procedures Revised to Control Use of Changing Acceptance Criteria by 921130 + (ML20116K942)
- ML20116K945 + (ML20116K945)
- ML20116K947 + (ML20116K947)
- 05000373/LER-1985-034-01, :on 850330,RHR Sys Shutdown Cooling Inboard Isolation Valve 1E12-F009 Isolated Four Times.Possibly Caused by Environmentally Qualified Pressure Switches W/O Pressure Snubbers.Pressure Snubbers Installed + (ML20116K950)
- ML20116K955 + (ML20116K955)
- ML20116K959 + (ML20116K959)
- ML20116K965 + (ML20116K965)
- ML20116K967 + (ML20116K967)
- ST-HL-AE-4253, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-498/92-26 & 50-499/92-26 on 921016.Corrective Actions: Util Will Assemble NRC & Util Reportability Documents & Consolidate Guidance.Ler 92-009-00 for Unit 1 Encl + (ML20116K974)
- ML20116K979 + (ML20116K979)
- ML20116K986 + (ML20116K986)
- ML20116K987 + (ML20116K987)
- ML20116L002 + (ML20116L002)
- ML20116L009 + (ML20116L009)
- ML20116L016 + (ML20116L016)
- B15839, Forwards Operational Readiness Plan Punchlist Items Identified for Restart as of 960808 for Plant,Unit 3, Correlation of Plant Sys to Sys Numbers & Abbreviations Used in Punchlist & Plan + (ML20116L017)
- ML20116L021 + (ML20116L021)
- ML20116L022 + (ML20116L022)
- ML20116L043 + (ML20116L043)
- ML20116L050 + (ML20116L050)
- ML20116L077 + (ML20116L077)
- ML20116L084 + (ML20116L084)
- ML20116L087 + (ML20116L087)
- RBG-37720, Special Rept:On 921013,Div I EDG Automatically Shutdown During Regular Monthly Surveillance Test.Caused by Failure of Shutdown Control Valve P-4.Valve Replaced & Surveillance Test Completed Approx 12 H After Valid Failure + (ML20116L115)
- ML20116L116 + (ML20116L116)
- ML20116L123 + (ML20116L123)
- RC-96-0208, Confirms Schedule for Next Operator Licensing Exams to Be Administered at Plant + (ML20116L130)
- ML20116L131 + (ML20116L131)
- ML20116L135 + (ML20116L135)
- ML20116L142 + (ML20116L142)
- ML20116L145 + (ML20116L145)
- ST-HL-AE-4258, Special Rept:On 921007,SDG Tripped on Turbocharger Thrust Bearing Failure.Caused by Improper Installation of New Eutectic or Degradation of Turbocharger.Turbocharger Replaced.Vendor Manual,Drawings & Procedures Revised + (ML20116L160)
- ML20116L161 + (ML20116L161)
- ML20116L164 + (ML20116L164)
- ML20116L173 + (ML20116L173)
- ML20116L181 + (ML20116L181)
- ML20116L190 + (ML20116L190)
- ML20116L194 + (ML20116L194)
- ML20116L200 + (ML20116L200)
- ML20116L205 + (ML20116L205)
- ML20116L210 + (ML20116L210)
- ML20116L212 + (ML20116L212)
- ML20116L215 + (ML20116L215)
- BVY-96-095, Monthly Operating Rept for July 1996 for VT Yankee Nuclear Power Station + (ML20116L223)
- ML20116L227 + (ML20116L227)
- U-602615, Forwards semi-annual Fitness for Duty Report for Period Ending 960630 + (ML20116L229)
- ML20116L230 + (ML20116L230)