Sesbrook Station Enginssring Office Public Service of New Hampshire-May 1, 1985 NEW HAMPSHIRE YANKEE DIVISION SBN-796 T.F.:
B4.4.2 United States Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Mr. R. A. Hartfield, Chief Management Information Branch Office of Management and Program Analysis
Reference:
(a) Construction Permits CPPR-135 and CPPR-136, Docket Nos. 50-443 and 50-444
Subject:
Construction Status Report:
Seabrook Station Unit 1 and Unit 2
Dear Sir:
We have attached the Construction Status Report for the period ending March 31, 1985.
Very truly yours, 4'
John DeVincentis, Director Engineering and Licensing Attachment ec: Atomic Safety and Licensing Board Service List i
l
?
B50503041{ QO D
'l '
Seabrook Station Construction Field Office. P.O. Box 700. Seabrook. NH O3874
6 '
William S. Jordan, III Donald E. Chick Diane Curran Town Manager
- Harmon, Weiss & Jordan Town of Exeter "f"?
20001 S. Street, N.W.
10 Front Street Suite 430 Exeter, NH 03833 Washington, D.C.
20009 Brentwood Board of Selectmen Robert G. Perlis RED Dalton Road Office of the Executive Legal Director Brentwood, NH 03833 U.S. Nuclear Regulatory Commission Washington, DC 20555 Richard E. Sullivan, Mayor-City Hall Robert A. Backus,' Esquire Newburyport, MA 01950 116 Lowell Street P.O. Box 516 Calvin A. Canney Manchester, NH 03105 City Manager City Hall Philip Ahrens, Esquire 126 Daniel Street Assistant Attorney General Portsmouth, NH 03801 Augusta, ME 04333 Dana Bisbee, Esquire Mr. John B. Tanzer Assistant Attorney General Designated Representative of Office of the Attorney General the Town of Hampton 208 State House Annex 5 Morningside Drive Concord, NH 03301 Hampton, NH 03842 Anne Verge, Chairperson Roberta C. Pevear Board of Selectmen Designated Representative of Town Hall the Town of Hampton Falls South Hampton, NH 03842 Drinkwater Road Hampton Falls, NH 03844 Patrick J. McKeon Selectmen's Office Mrs. Sandra Gavutis 10 Central Road.
Designated Representative of Rye, NH 03870 the Town of Kensington RFD 1 Carole F. Kagan, Esquire East Kingston, NH 03827 Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Cokmission Jo[ Ann Shotwell, Esquire Washington, DC 20555 Assistant Attorney General Environmental Protection Bureau Mr. Angi Machiros Department of the Attorney General Chairman of the Board of Selectmen One Ashburton Place, 19th Floor Town of Newbury Boston, MA 02108 Newbury, MA 01950 Senator Gordon J. Humphrey Town Manager's Office U.S. Senate Town Hall - Friend Street Washington, DC 20510 Amesbury, MA 01913 (ATTN: Tom Burack)
Senator Gordon J. Humphrey Diana P. Randall 1 Pillsbury Street 70 Collins Street Concord, NH 03301 Seabrook, NH 03874 (ATIN: Herb Boynton) at er itt I
C0NSTRUCTION s
. - ' g :n s S T A,T u.S' R E P O.R T PAGE NO: 2-800
=
SEABROOK 1 N U C L E,A R,P,0 W E R, PLANTS STATUS AS OFs PLANY C H A R A,C T E,R.I,5 T ! C St
,K E,Y P E R S O N N E Lt Q.J.Hgggesow, PASSIDENT MWD DOCKET N08 05000443 CORPORAft CONTACT:
". O. ?itiNi". CHIEP EXEC. OFFICER CP N0. 8 DATE ISSUED: CPPR-135/ 07-07-74 CP EXPIRATION DATES 96-H 106-3o-86 CORPORATE ADDRES$8 1000 ELM STREET APPLICANT:
PUBL'IC SERVICE OF MEW HAMPSHIRE i
PLANT LOCATION:
'80 MI 5 0F PORTSMOUTH. NH MANCHESTER, NEW HAMPSHIRE 03105 IE REGIDH8
'l t
CORPORATE PHONE NO:
(603) 669-4000 4
AE U ITED ENG. 8 CONSTRUCTORS i
HS$5 W STINGHOUSE CONSTRUCTOR
- UrlITED ENG.'8 CONSTRUCTORS HRC LPM:
-1. '":"I' Z Y. N62$$$
REACTOR TYPE:
PWR ~ ~
IE PROJECT INSPEC10Rt DER (MWE)8
,1198 IE RESIDENT-INSPECTOR A. C. CERNE INSPECT I0H S'T A T U St.
,l FUEL L0A D DATE CHANGES 26N.19%T i
"n th6RCH OSI f
t.-
REPORT NEW REASON FOR CHANGE j
REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY i
NilMRJf.
OF.TNSP.
OF THSP.
t i
1 09-06-77 09-01-82 DELAYS DUE TO EPA REVERSAL OF PREVIOUS 05-04-82 M-N i
82-05 2, - -
05-06-82 APPROVAL OF ONCE THROUGH CIRCULATING WATER SYSTEM 4 $UBSEQ. NRC WITHDRAWAL OF M e.
06-21-82 0-i CONST PERMIT. 8 TIME REQ TO REMOBILIZE j
11-08-78 01-01-83 SCHEDULE REEVALUATION.
04-04-81 11-30-83 SCHEDULE REEVALUATION.
Inspection Reports are available at Iocal PDRs.
li-30-$f, 09-30-89 SCMdDut.f Rfevnt.WTioM i
l 84-l'7 to-19-99 i t 24 09-25-gg og-3o-g(. ScHebuur Resvat.unisod 24-It 37.-os-84
- z-et-gy-INtoAPot ATINGt IMPACT OF l
gg-19 opera.rroes Exa s ResuiTs sm mhspsw p OASH RESTelcDoo3S 1M ICl8'l j
34-10 11-19-99 ot-Iq-gf 95-02 01-1.1'- 94~
62 - 0 4 - 9S~
}
RS-oS oz-u -SS o3-os-gg s
L0CA L PUBLIC D0CUMENT R 0 0 M:
i I
~
EXETER PUBLIC LIBRARY TRONT STREET i
EXE1ER. NEW HAMPSHIRE 03883 1
i
AN CONSTRUCTION STATUS REPORT PAGE NO. 2-120
'SEABROOK STATION I NUCLEAR POWER PLANTS STATUS AS OF 2 :: 0' (23 -JII-NtI'.
CONSTRUCTION STATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
04-30-86 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS DEFINED IN APPLICANT'S PREVIOUS ESTLMATED FUEL LOADING DATE:
09-30-84 CP: (EARLIEST) February,1979 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
08-01-81 (LATEST). June, 1986 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE:
08-31-86 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:
COMMENTS RECARDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION
% COMPLETE MOBILIZE AND PREPARE SITE:
7-76 8-77 100 %
+
PLACE STRUCTURAL CONCRETE:
9-77 4-86 98 %
INSTALL REACTOR PRESSURE VESSEL:
5-81 5-81 100 %
INSTALL LARGE BORE PROCESS PIPE:
10-79 2-86 Jbe % $$
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS, AND SNUBBERS:
10-79 2-86 3d % 7tf' INSTALL SMALL BORE PIPE:
9-80 2-86 36' % 77 INSTALL CABLE TRAY:
9-79 2-86 98 %
INSTALL EXPOSED METAL CONDUIT:
4-79 2-86 4e %%
IhSTALL POWER, CONTROL, INSTRUMENTATION, AND SECURITY CABLE:
5-81 2-86 ed" 2 5 IN0 TALL ELECTRICAL TERMINATIONS:
6-81 2-86 46 Z jdf CONDUCT REACTOR COLD HYDROSTATIC TEST:
h 3-SI N
Q g[
==#-t 800 %
g CONDUCT HOT FUNCTIONAL TEST:
11-85 11-85 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
11-82 4-86 5%
i r
t A
t fff 4
4 _
[..g d
94 4
f h '
4 b
-e e 6 g
n
4 C0H5TRUCTIOH
$TATUS REP 0RT PAGE NO: 2-102 3EABR00K 2 HUCLEAR POWER PLANT $
STATUS A5 0F 0 0 PLANT C H A R A C T-E R.I 5 T I C 5 KEY P E R S 0 N N E Lt d.J. N ARftsso N DOCKET Hos 05000444 o
CORPORATE CONTACT "2.
. ' ' L i '" " PRLSIDENT AND ON88f CP HO. 8 DATE ISSUED: CPPR-136/ 07-07-76 fx6 C.. O FD CEd-CP EXPIRATION DATE:
- ' O ', to 33-ff CORPORATE ADDRE558 1000 ELM STREET APPLICANT:
PUBLIC SERVICE OF HEW HAMP5 HIRE MANCHESTER, NEW HAMP5 HIRE 03105 PLANT LOCATION:
10.NI 5 0F PORT 5 MOUTH. NH IE REGION 1
CORPORATE PHONE N08 (603) 669-4000 AE UNITED ENG. 8 CONSTRUCTORS H5558 WESTINGHOUSE CONSTRUCTOR UNITED EHG. 8 CONSTRUCTOR $
HRC LPM:
DER (MWE):
.1198 IE RESIDENT INSPECTOR:
A. C. CERHE IH5P ECT ION 5 T A T U 58 F U E'L L0AD DATE CHAHGE5 TIME PERIOD A $_
REP 0RTED BY UTILITY a?:: - J u r,
- ?:2 (D M RCH IT 3Ao 1997 REPORT HEW REASON FOR CHANGE REPORT BEG DATE EHD DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
'oi-e' at-04-82
?!-:C 62-09-01-84 DELAYS DUE TO EPA REVERSAL OF PREVIOUS 09-06-77 APPROVAL OF DHCE THROUGH CIRCULATIHG "2-0" va-06-52 e, O' O
WATER SYSTEM & SUBSE0. NRC WITHDRAWAL OF CONST PERMIT. A TIME REQ TO REn0BILIZE 11-08-78 11-01-84 SCHEDULE REEVALUATIDH.
04-04-81 02-28-86 SCHEDULE REEVALUATION.
Inspection Reports are available at local PDRs.
J g.go.g jg.g g.% SCH60ut4 Res Mt.up ofd 84-07 t o gi 17.- 8 7-RSI es.- 2.o -93 o't-so-z? ScHebd NervAs.k AfloN I1-I Y"U 07.-19-88 tog.N
@Eygg40NA7E N/t7MS 3
o L0 CAL PUBLIC D0CUMEHT R,0 0 Ms EXETER PUBLIC LIBRARY FRONT STREET EXETER. NEW HAMP5 HIRE 03883 8
e
__d
.e a
r r?.W
(*% gw
' y :.
"'^
CONSTRUCTION STATUS R E_P O R T'
' PACE NO.'2-122' SEABROOK STATION 2 NUCLEAR POWER, PLANTS-STATUS AS OF: 4d>46= b.
63-3I-W CONSTRUCTION-S T A T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS DEFINED IN APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
04-30-87 CP: (EARLIEST) January,1981
' APPLICANT'S ESTIMATED FUEL LOADINC DATE AT CP ISSUANCE:
10-01-83 (LATEST) October, 1988 APPLICANT'S CURRENT ESTIMATED COpetERCIAL OPERATION DATE:
CURRE::T ESTIMAT::D PERCENT CONSTRUCTION CON?LETE: 24%
COMMENTS RECARDING CUREENT CONSTRUCTION 9T.*TUS:
INDETERMINATE ESTIMATED
- ACTUAL ESTIMATED * '
ACTUAL
' ESTIMATED
- START START COMPLETION COMPLETION
% COMPLETE MOBILIZE AND PREPARE SITE:'
7-76 8-77 100 %
PLACE STRUCTURAL CONCRETE: 81 69 %
INSTALL REACTOR PRESSURE VESSEL:
10-83 12-83 100 %
INSTALL LARGE BORE PROCESS PIPE:
9-82 4%
INSTALL LARGE BORE PIPE HANCERS, RESTRAINTS, AND SNUBBERS:
9-82 3%
INSTALL SMALL BORE PIPE:
0%
INSTALL CABLE TRAY:
0I.
INSTALL EXPOSED METAL CONDUIT:
0%
INSTALL POWER, CONTROL, INSTRUMENTATION, AND SECURITY CABLE:
0%
INSTALL ELECTRICAL TERMINATIONS:
'O%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
0%
' 3 CONDUCT HOT FUNCTIONAL TEST:
-0%-
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
0%
- Indeterminate.