ML20116L077

From kanterella
Jump to navigation Jump to search
Forwards Prairie Island Site-Specific Offsite Radiological Emergency Preparedness Alert & Notification Sys QA Verification. Based on Review,Sys Meets Specific Design Requirements of NUREG-0654
ML20116L077
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 04/25/1985
From: Speck S
Federal Emergency Management Agency
To: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML20116L080 List:
References
RTR-NUREG-0654, RTR-NUREG-654 NUDOCS 8505030474
Download: ML20116L077 (1)


Text

- _

i o [N k

+%

k

[* 3

Federal Emergency Management Agency Washington, D.C. 20472

}g{[Ow_

k APR 251985 M~

hj naEg+l u Mr. William J. Dircks b Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Dircks:

The Federal Emergency Management Agency (FEMA) has completed an analysis of the prompt alert and notification system for the Prairie Island Nuclear Generating Plant in Red Wing, Minnesota. This review has been completed pursuant to FEMA rule 44 CFR 350; selected evaluative criteria and Appendix 3 in NUREG-0654/ FEMA-REP-1, Rev.1; and FEMA-43, the " Standard Guide for the Evaluation of Alert and Notification Systems for Nuclear Power Plants." The enclosed report eatitled " Prairie Island Nuclear Generating Plant Site-Specific Offsite Radiological Emergency Preparedness Alert and Notification System Ouality Assurance Verification," summarizes the engineering design review, incorporates the results of the telephone survey of the public conducted immediately following the alert and notification system activation on October 3, 1984, and includes the results of the review of the other applicable evaluative criteria from NUREG-0654/ FEMA-REP-1, Rev.1, and FEMA-43.

Based on the aforementioned review and the results of the alert and notification system activation, FEMA has determined that the prompt alert and notification g

/

system installed around the Prairie Island Nuclear Generating Plant meets the specific design requirements of NUREG-0654/ FEMA-REP-1, Rev.1 and FEMA-43, and that there is reasonable assurance that the system is adequate to promptly alert and notify the public in the event of an accident at the site. A complete review of the offsite plans and preparedness for the Prairie Island Nuclear Generating Plant under FEMA rule 44 CFR 350, will be completed at a later date.

Sincerely, l

& : r _^ O _

Samuel W. Speck Associate Director i

State and Local Programs and Support l

Enclosure .