Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20116C489 + (ML20116C489)
- ML20116C494 + (ML20116C494)
- ML20116C495 + (ML20116C495)
- ML20116C508 + (ML20116C508)
- ML20116C509 + (ML20116C509)
- ML20116C538 + (ML20116C538)
- ML20116C551 + (ML20116C551)
- 05000423/LER-1996-022-02, :on 960722,EDG Control Panel Noncompliance W/Seismic Design Basis Occurred.Caused by Personnel Error. All Latches Repaired & Restored + (ML20116C559)
- ML20116C560 + (ML20116C560)
- BVY-92-122, Forwards Updated Operator Licensing Schedule,Per Generic Ltr 92-06 + (ML20116C564)
- ML20116C568 + (ML20116C568)
- ML20116C572 + (ML20116C572)
- ML20116C574 + (ML20116C574)
- ML20116C576 + (ML20116C576)
- ML20116C587 + (ML20116C587)
- ML20116C589 + (ML20116C589)
- ML20116C591 + (ML20116C591)
- ML20116C599 + (ML20116C599)
- ML20116C600 + (ML20116C600)
- ML20116C603 + (ML20116C603)
- 05000282/LER-1996-012, :on 960630,both Reactors Tripped Following Loss of Three of Four 345 Kv Offsite Transmission Lines.Caused by High Winds.Repaired Line Downed Phase & Repaired Failed Support Structures + (ML20116C610)
- NSD-NRC-96-4779, Forwards Response to Request for Addl Info Re AP600 leak-before-break Questions + (ML20116C620)
- ML20116C636 + (ML20116C636)
- ML20116C648 + (ML20116C648)
- ML20116C663 + (ML20116C663)
- ML20116C674 + (ML20116C674)
- ML20116C678 + (ML20116C678)
- ML20116C679 + (ML20116C679)
- ML20116C680 + (ML20116C680)
- ML20116C684 + (ML20116C684)
- ML20116C687 + (ML20116C687)
- ML20116C693 + (ML20116C693)
- ML20116C703 + (ML20116C703)
- RC-96-0192, Provides Suppl Info Re TS Amend Request 95-11,addressing Frequency Change Requested for VCSNS TS 4.6.1.7.3 + (ML20116C704)
- ML20116C714 + (ML20116C714)
- NSD-NRC-96-4780, Forwards Three Copies of Licensee Responses to NRC RAI on AP600 + (ML20116C716)
- ML20116C718 + (ML20116C718)
- U-602613, Calcs for Functional Requirements for First & Second Level Undervoltage Relays at 4kV 1A1,1B1 & 1C1 + (ML20116C719)
- ML20116C722 + (ML20116C722)
- ML20116C725 + (ML20116C725)
- 05000395/LER-1985-007, :on 850321,determined Scaffolding Installed for Preventive Maint on Overhead Cranes Could Have Adverse Impact on Operability of Onsite Ac Sources.Caused by Personnel Error.Personnel Counseled + (ML20116C737)
- ML20116C758 + (ML20116C758)
- ML20116C763 + (ML20116C763)
- ML20116C771 + (ML20116C771)
- ML20116C776 + (ML20116C776)
- PY-CEI-NRR-1564, Withdraws Request for Emergency Changes on E51-F064 & G33-F004 Valves + (ML20116C778)
- ML20116C781 + (ML20116C781)
- 05000382/LER-1985-009, :on 850320,containment Airlock Door Seal Leakage Test Not Performed within Time Frame Specified by Tech Specs.Cause Not Stated.Surveillance Performed. Containment Entry Times Posted + (ML20116C782)
- 05000423/LER-1996-020-03, :on 960627,Mode 5 of Ms Motor Driven Atmospheric Relief Valves Were Determined Not to Be Able to Perform Safety Functions.Caused by Personnel Error.Revised Design Basis Review & Thrust Calculation + (ML20116C789)
- 05000423/LER-1996-019-02, :on 960627,RCS PORV Block Valves Were Determined to Be Unable to Perform Intended Safety Functions.Caused by Structural Design Deficiency.C/A Will Be Provided in Supplement to Rept + (ML20116C793)
- ML20116C802 + (ML20116C802)