3 GPU Nuclear Corporatios Qhgg One Upper Pond Road Parsippany, New Jersey 07054 201 316-700')
TELEX 136-482 Wnter's Direct Dial Nurnber October 26, 1992 5000-92-3080 C321-92-2283 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555 Gentkmen:
Subject:
Oyster Creek Nuclear Generating Station (OCNGS)
Docket No. 50-219 Facility Operating Licec.se No. der-16
" Phase-Out of Fuel Channci Reuse'
Reference:
GPUN Letter C321-92-2098/5000-92-3017 dated April 2, 1992, "0yster Creek fuel Channel Bowing".
In the referenced letter, GPU Nuclear stated "
,tne impact of large bowed reu* sd channels to the Oyster Creek channel reuse program has not been de' ;rmined. A study -to identify a channel management prog-tm which will minimize -the development of large bows has been initiateL.*
In addition, GPU Nuclear committed to "... inform the NRC of fuel channel reuse at Oyster Creek for cycle 14 and beyond prior to the next refueling."
GPU Nuclear nas since completed the study to identify a cnannel management i
program which woul? control the !avelopment of large channel bows. Our channel measurements. and tne bow model prediction code confirm that reused channels exceeding 60 GWD/MTU will develop excessive bows. The study concluded that larqe bows-in reused channels cannot be avoided without sionificantly affecting_Ie i economy. Consequently, fuel channel reuse at Oyster Creek will be phased out.
commencing with the next refu'eling, cycle 14.
The channel euse phase-out' effectively commenced in cycle 13 when only eight (8)-
channels we e reused on new fuel bundles instead of the anticipated 50. Channels will no loager be reused on-new fuel and the reused channel phase-out will_.be
- ccmpleted at the _end-of-cycle 15, currently planned for November,1996.
9211040241 921026 POR ADOCK 05000219 9
-PDR g Q p,;
GPU Nuclear Corporation is a subsidiary of General Pubhc Utiltes Corporation
{
,4 C321-92-2283 Page 2 Based on the preliminary cycle 14 core design, 46 reused fuel channels will remain in the core. During the phase-out program, c ase remaining reused channels will not resids an limiting core locations for fuel thermal limits.
Fuel channels that ara projected to exceed 60 GWD/MlU will be replaced. GPU Nuclear will continue io calculate an oply the channel bow CPR penalty in accordance with NRC Bulletin is,. 90-02 ar,
s described in the GPU kuclear letters of May 21, 1990 and July 20, 1990.
If you have any questions or corrment s oa this submittal, please contact Mr. Michael Laggart, Manager, Corporate Nuclear Licensing at (201) 3161368.
Very truly yours,
}uub-J. C. DeVine, Jr.
Vice President and Director Technical Functions cc: