Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20114B773 + (ML20114B773)
- ML20114B774 + (ML20114B774)
- ML20114B776 + (ML20114B776)
- ML20114B780 + (ML20114B780)
- ML20114B781 + (ML20114B781)
- 05000443/LER-1992-009, :on 920729,determined That 18-month Surveillance Testing Program for Reactor Trip Breakers & Reactor Trip Bypass Breakers Did Not Test Shunt Trip Circuits.Caused by Inadequate Procedure + (ML20114B783)
- ML20114B784 + (ML20114B784)
- 05000366/LER-1992-012-01, :on 920727,determined That Requirements of TS Section 4.6.5.1 Not Met for Spent Fuel Shipping Cask Handling Activities.Caused by Misinterpretation of TS Sr. Ltr Issued to Correct TS Interpretation + (ML20114B786)
- 05000263/LER-1992-009, :on 920728,HPCI Declared Inoperable Due to Concerns That Sys Would Not Perform as Described in FSAR During Atws.Caused by Inadequate Consendate Storage Tank Inventory.Updated FSAR Will Be Revised + (ML20114B788)
- ML20114B789 + (ML20114B789)
- 05000382/LER-1992-008-01, :on 920726,inadvertent Esfa Occurred Due to Plant Protection Sys Test Circuit Malfunction.Cause Undetermined.Trouble Shooting Plan Developed to Isolate Specific Components to Resolve Problem + (ML20114B790)
- ML20114B793 + (ML20114B793)
- ML20114B797 + (ML20114B797)
- ML20114B799 + (ML20114B799)
- ML20114B800 + (ML20114B800)
- ML20114B801 + (ML20114B801)
- ML20114B802 + (ML20114B802)
- ML20114B803 + (ML20114B803)
- ML20114B805 + (ML20114B805)
- ML20114B809 + (ML20114B809)
- ML20114B821 + (ML20114B821)
- ML20114B829 + (ML20114B829)
- ML20114B830 + (ML20114B830)
- ML20114B834 + (ML20114B834)
- ML20114B848 + (ML20114B848)
- ML20114B858 + (ML20114B858)
- ML20114B862 + (ML20114B862)
- ML20114B871 + (ML20114B871)
- ML20114B879 + (ML20114B879)
- ML20114B889 + (ML20114B889)
- ML20114B895 + (ML20114B895)
- ML20114B902 + (ML20114B902)
- U-602027, Forwards Semiannual Fitness for Duty Rept for Period Ending 920630,per 10CFR26.71 + (ML20114B913)
- ML20114B915 + (ML20114B915)
- ML20114B916 + (ML20114B916)
- ML20114B918 + (ML20114B918)
- ML20114B923 + (ML20114B923)
- ML20114B934 + (ML20114B934)
- ML20114B939 + (ML20114B939)
- ML20114B940 + (ML20114B940)
- ML20114B942 + (ML20114B942)
- ML20114B944 + (ML20114B944)
- ML20114B945 + (ML20114B945)
- ML20114B947 + (ML20114B947)
- ML20114B949 + (ML20114B949)
- 05000352/LER-1991-017-02, :on 910408,discovered That Fuse FU-10 Missing from Potential Transformer Circuit.Caused by Personnel Error.On 910613,second Offsite Source Incapable of Supplying Power to Safeguard Buses.Fuse Replaced + (ML20114B954)
- ML20114B955 + (ML20114B955)
- ML20114B956 + (ML20114B956)
- ML20114B958 + (ML20114B958)
- ML20114B960 + (ML20114B960)
- ML20114B962 + (ML20114B962)